Repair Zavalla Sewer System

Project ID: 12445126Q0004 FederalOpportunitiesSynopsis Solicitation
Overview
AgencyUSFS Region 9: Eastern Region
Deadline01/23/26
Posted01/08/26
Estimated ValueNot Provided
Set AsideSmall Business
NAICS238220 - Plumbing, Heating, and Air-Conditioning Contractors
PSCJ045 - Maint/Repair/Rebuild Of Equipment- Plumbing, Heating, And Waste Disposal Equipment
LocationZavalla, TX 75980 United States
Description
Primary Latest Change

SCOPE of WORK

The goal of this project is to remove and replace two effluent pumps from aerobic septic system, including electrical and plumping associated with pumps. Restore sewer service to the Angelina District Ranger Office at 111 Walnut Ridge Road, Zavalla, Texas. Contractor shall replace the pumps and perform necessary ancillary services in accordance with the attached Statement of Work. The contractor shall provide all labor and materials required to complete the project. All work shall meet all applicable codes and standards.

LOCATION

ANGELINA DISTRICT RANGER OFFICE, 111 WALNUT ROAD, ZAVALLA TX 75980 DATES:Period of Performance- 01/23/2026 to 02/27/2026

TYPE of CONTRACT

This RFQ will result in the issuance of a Firm Fixed Price Contract

SET ASIDE

100% Small Business MAGNITUDE: In accordance with FAR 36.204, the magnitude of this contract is: (a)Less than $25,000. Delivery: 02/27/2026

Summary (Newest Update)

Background The USDA Forest Service is issuing this contract to repair the failed sewer system at the Angelina District Ranger Office. The goal of this project is to restore sewer service by replacing two effluent pumps from the aerobic septic system. This initiative aligns with the agency's mission to maintain operational facilities and ensure environmental compliance. Work Details The contractor is required to remove and replace two effluent pumps from the aerobic septic system, including all associated electrical and plumbing work. The contractor shall provide all necessary labor and materials to complete the project, ensuring that all work meets applicable codes and standards. Specific tasks include: 1) Labor for pump removal and replacement; 2) Installation of (2) ¾ HP septic effluent spray pumps; 3) Installation of a pump control panel for the aerobic septic system with dual spray pumps. Period of Performance The contract will be performed from January 23, 2026, to February 27, 2026. Place of Performance All work will be conducted at the Angelina District Ranger Office located at 111 Walnut Ridge Road, Zavalla, Texas, 75980.

Contacts
Contact nameRichard Huffman
Contact emailrichard.huffman@usda.gov
Contact phone(501) 431-7084
Secondary contact nameSteven J Alves
Secondary contact emailsteven.alves@udsa.gov
Secondary contact phone(859) 334-0524
Same Region Opportunities