Naaman to Newman Transmission Material
Agency: Garland [TX]
Location: Texas
NAICS: Not Provided
| Agency | Air Education and Training Command |
|---|---|
| Deadline | 05/26/26 |
| Posted | 05/13/26 |
| Estimated Value | $250,000 - $1,500,000 (AI estimate) |
| Set Aside | SBA |
| NAICS | 238210 - Electrical Contractors and Other Wiring Installation Contractors |
| PSC | J062 - Maint/Repair/Rebuild Of Equipment- Lighting Fixtures And Lamps |
| Location | JBSA Lackland, TX 78236 United States |
The contractor shall provide all personnel, equipment, tools, materials, supervision and all other items or services necessary to perform the requirements as described in this Statement of Work (SOW) at JBSA Lackland, Kelly Airfield, TX. Replace the raised lights/signs after the B-52 taxis or is towed to the runway as defined in this SOW. Contractor shall be responsible for ensuring the B-52 has access to Boeing from the runway and ensure the lights/signs are restored back to original condition. The runway and taxiway lights and signs, as described in this SOW, are included in this contract. Attachment 1 - BPA B52 Runway Lighting SOW 11 May 26 Attachment 2 - SCA WD 2015-5253 Rev 29 - 30 Apr 26 Attachment 3 - PoSA Runway - Taxiway Lights and Signage Attachment 4 - Schedule B B-52 CERP Airfield Lighting BPA Price List
Tuesday, 19 May 2026, 11:00 AM, CDT
Tuesday, 26 May 2026 at 11:00 AM, CDT
Background The contract is issued by the 502d Contracting Squadron at Joint Base San Antonio (JBSA) Lackland, Texas. The mission of this agency is to facilitate safe aircraft operations at Kelly Airfield. The goal of the contract is to ensure the removal and replacement of runway and taxiway lights and signs to maintain operational safety for B-52 aircraft during taxiing and takeoff. Work Details The contractor shall provide all personnel, equipment, tools, materials, supervision, and other necessary items or services to perform the following tasks: - Uninstall and remove sixty (60) raised lights along Runway 16/34 between Taxiway C and Taxiway E; - Uninstall thirty-eight (38) raised lights between Runway 16/34 and the Boeing ramp within 110 feet from the runway/taxiway centerline; - Uninstall one (1) runway exit sign at the NE corner of Runways 16/34 and Taxiway E; - Uninstall one (1) runway exit sign at the intersection of Taxiway B and the departure end of Runway 34; - Uninstall six (6) signs on Taxiway E; - Replace all removed lights/signs after B-52 operations as defined in this SOW. The contractor must ensure that the B-52 has access to Boeing from the runway and restore all lights/signs to their original condition. All work must comply with federal, state, local environmental laws, and current FAA regulations. Place of Performance The construction projects will be performed at Joint Base San Antonio Lackland, specifically at Kelly Airfield, Texas.
| Contact name | Brent Paul |
|---|---|
| Contact email | brent.paul.1@us.af.mil |
| Contact phone | (210) 421-3228 |
| Secondary contact name | Kristy Solis |
| Secondary contact email | kristy.solis@us.af.mil |
| Secondary contact phone | (210) 671-1717 |
Agency: Garland [TX]
Location: Texas
NAICS: Not Provided
Agency: VISN 17: Heart of Texas Health Care Network
Location: Texas
NAICS: 325413
Agency: VISN 17: Heart of Texas Health Care Network
Location: Texas
NAICS: 611430
Agency: Air Education and Training Command
Location: Texas
NAICS: 236220