Downtown Window Painting
Agency: City of Kingsland [GA]
Location: Georgia
NAICS: Not Provided
| Agency | VISN 7: Southeast Network |
|---|---|
| Deadline | 05/22/26 |
| Posted | 05/12/26 |
| Estimated Value | $3,500,000 - $8,000,000 (AI estimate) |
| Set Aside | SDVOSBC |
| NAICS | 236220 - Commercial and Institutional Building Construction |
| PSC | Y1DA - Construction Of Hospitals And Infirmaries |
| Location | Department of Veterans Affairs Charlie Norwood VA Medical Center Augusta, GA 30904-2608 United States |
NOTICE OF INTENT TO SOLE SOURCE The Department of Veterans Affairs, Network Contracting Office (NCO) 7 intends to award a contract in accordance with Federal Acquisition Regulations (FAR) Subpart 6.302-1, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. NCO 7 intends to negotiate, and award to NACCI Construction. a sole/single source, firm-fixed price contract for construction. Project No. 509-24-250, Title: Cooling Towers CON located at Charlie Norwood VA Medical Center, 950 15th Street, Augusta, GA, 30904-2608 This project involves the complete demolition and replacement of the existing cooling tower system at the Charlie Norwood VA Medical Center Central Energy Plant in Augusta, Georgia. The work includes removal of the existing cooling tower, concrete basin, condenser water pumps, and related electrical and control systems, followed by installation of a new four-cell cooling tower, reinforced concrete basin, variable-speed condenser water pumps with NEMA 4 VFDs, new condenser water piping, insulation, and heat tracing. The contractor shall also provide a temporary cooling tower to maintain continuous plant operation during construction, integrate new systems into the existing JCI Metasys Building Automation System, and perform all associated structural, mechanical, electrical, and control work in accordance with VA standards and applicable codes. Upon completion, the contractor shall test, balance, and commission the new system to ensure full functionality and compliance with project requirements. THIS NOTICE IS NOT A REQUEST FOR COMPETITIVE PROPOSALS and no solicitation will be issued; however, any System for Award Management (SAM) registered firm that it can meet the requirement may give a written notification to the Contracting Officer in the form of a capability statement, including an explanation how the contractor would be able to effectively and efficiently perform the above functions.. Any prospective Construction firm will need to possess working knowledge of all issues that may arise and will assume the liabilities associated with all aspects of the design. Responses must be provided by May 22, 2026, by 16:00 PM MST. A determination by the Government not to complete this procurement will be based on market research, including responses to this notice. It is within the Government's sole discretion to decide whether the information received in response to this notice warrants development of an alternative approach or not. Information received will be considered solely for the purpose of determining whether to conduct competitive procurement. There will not be reimbursement to any firm to develop a response to this notice. The NAICS code is 236220 and the size standard is $45M. No responses to this notice are requested. No solicitation package will be issued. This notice of intent IS NOT a request for competitive proposals.
Background The Department of Veterans Affairs, Network Contracting Office (NCO) 7 intends to award a sole source contract to NACCI Construction for the replacement of the cooling tower system at the Charlie Norwood VA Medical Center. This project is necessary to ensure the continued operation and efficiency of the facility's Central Energy Plant, which is critical for supporting the medical center's mission. Work Details The project involves complete demolition and replacement of the existing cooling tower system. Specific tasks include: removal of the existing cooling tower, concrete basin, condenser water pumps, and related electrical and control systems; installation of a new four-cell cooling tower; construction of a reinforced concrete basin; installation of variable-speed condenser water pumps with NEMA 4 VFDs; new condenser water piping, insulation, and heat tracing. The contractor must also provide a temporary cooling tower to maintain continuous plant operation during construction, integrate new systems into the existing JCI Metasys Building Automation System, and perform all associated structural, mechanical, electrical, and control work in accordance with VA standards and applicable codes. Upon completion, testing, balancing, and commissioning of the new system will be required to ensure full functionality. Place of Performance Charlie Norwood VA Medical Center, 950 15th Street, Augusta, GA 30904-2608
| Contact name | Kenyon Dulaney |
|---|---|
| Contact email | kenyon.dulaney@va.gov |
| Contact phone | (512) 981-4449 |
Agency: City of Kingsland [GA]
Location: Georgia
NAICS: Not Provided
Agency: Board Of(University System of Georgia) Regents [GA]
Location: Georgia
NAICS: Not Provided
Agency: Montgomery County Board of Commissioners [GA]
Location: Georgia
NAICS: Not Provided
Agency: PINEVIEW, CITY OF [GA]
Location: Georgia
NAICS: Not Provided