Downtown Window Painting
Agency: City of Kingsland [GA]
Location: Georgia
NAICS: Not Provided
| Agency | Centers for Disease Control and Prevention |
|---|---|
| Deadline | 06/17/26 |
| Posted | 05/11/26 |
| Estimated Value | Not Provided |
| Set Aside | SBA |
| NAICS | 238220 - Plumbing, Heating, and Air-Conditioning Contractors |
| PSC | Z2AA - Repair Or Alteration Of Office Buildings |
| Location | 1600 Clifton Road Atlanta, GA 30329 United States |
This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility. PLEASE SUBMIT OR RESUBMIT VISITOR SHEET AND NON DISCLOSURE BY 4PM ON MAY 14, TO RECEIVE THE REQUIRED DRAWINGS AND ACCESS TO THE SITE VISIT. EMAIL HKHERA@CDC.GOV AND WBRYAN2@CDC.GOV
MAY 19TH @10AM Q&A's: MAY 27TH @12 PM PROPOSAL: JUNE 17@ 10AM
Background The Centers for Disease Control and Prevention (CDC) is undertaking a modernization project for Building 10 at the Roybal Campus in Atlanta, Georgia. The primary objective of this acquisition is to provide comprehensive design-build services aimed at replacing outdated chilled-water plant equipment, enhancing electrical and controls infrastructure, and ensuring uninterrupted campus operations during the phased execution of the project. This initiative is crucial for maintaining reliable service to meet the evolving needs of the campus. Work Details The scope of work includes: 1. Design: Complete design services including specifications, equipment schedules, and drawings. Phasing documentation to minimize disruption. 2. Chilled Water Improvements: Replacement of four existing 1,450 ton chillers with new 1,800 ton chillers; replacement of nine cooling towers with eight new ones; replacement of four primary chilled water pumps and associated VFDs; upgrades to electrical systems to ensure dedicated breakers for each chiller; structural upgrades for walkways and supports; instrumentation and controls upgrades for variable primary chilled water flow. 3. Mechanical: Installation of new chillers with specific performance criteria, including efficiency ratings and compatibility with existing systems. 4. Piping: Modifications to chilled water return piping and replacement of all existing condenser water piping; installation of new valves and strainers. 5. Construction Phasing: Work must be phased to minimize downtime, with no more than two chillers out of service at any time. 6. Electrical: Upgrades to medium voltage systems, motor control centers, and integration into building automation systems (BAS). 7. Commissioning: A third-party commissioning agent will verify that all systems meet design specifications. Period of Performance The contract will be performed over a period not exceeding 462 calendar days from the task order award. Place of Performance All construction activities will take place at the CDC Roybal Campus located at 1600 Clifton Road, Atlanta GA.
| Contact name | Simi Khera |
|---|---|
| Contact email | hkhera@cdc.gov |
| Contact phone | None |
Agency: City of Kingsland [GA]
Location: Georgia
NAICS: Not Provided
Agency: Board Of(University System of Georgia) Regents [GA]
Location: Georgia
NAICS: Not Provided
Agency: Montgomery County Board of Commissioners [GA]
Location: Georgia
NAICS: Not Provided
Agency: PINEVIEW, CITY OF [GA]
Location: Georgia
NAICS: Not Provided