Baconton Charter Pavilion
Agency: Baconton Community Charter School [GA]
Location: Georgia
NAICS: Not Provided
| Agency | City of Albany [GA] |
|---|---|
| Deadline | 03/04/26 |
| Posted | 01/30/26 |
| Estimated Value | $500,000 - $1,500,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Georgia |
Sealed Bids will be received by the City of Albany, Procurement Division, 222 Pine Avenue, Suite 260, Albany, Georgia 31701, until 2:30 p.m. on March 04, 2026, for all work required for replacing water mains in accordance with bid documents, specifications, and all other contract documents.
Background The City of Albany, Georgia, is issuing this solicitation for the replacement of water mains in three specific locations. The project aims to enhance the city's water distribution infrastructure and ensure compliance with local and state regulations. The work will be awarded to the lowest responsive and responsible bidder based on a lump sum basis. Work Details The project consists of three divisions: 1. **Division I: Taft St.** - Replace approximately 1,200 feet of existing 2-inch galvanized water main with a new 6-inch C900 water main. - Install two 3.5' hydrants with valves. - Renew services from meter to main using 1-inch HDPE tubing. - Cut and abandon the old 2-inch main. - Restore affected driveways/roadways to original condition. 2. **Division II: S. Davis St.** - Replace approximately 1,700 feet of existing 2-inch galvanized main with new 6-inch C900 main. - Install two hydrants at approximately 500' intervals. - Renew services from meter to main using 1-inch HDPE tubing. - Cut and abandon the old 2-inch main. - Restore affected driveways/roadways to original condition. 3. **Division III: Carroll St./Central St.** - Replace approximately 2,200 feet of existing 2-inch galvanized water main with a new 6-inch C900 water main. - Install two hydrants at approximately 500' intervals. - Renew services from meter to main using either 1-inch or 2-inch taps and HDPE tubing. - Cut and abandon the old 2-inch main. - Restore affected driveways/roadways to original condition. Period of Performance Each division must be completed within one hundred twenty (120) calendar days from the issuance of a Notice to Proceed. Place of Performance The work will be performed at three locations in Albany, Georgia: Taft St., S. Davis St., and Carroll St./Central St. Bidder Requirements Bidders must hold a Utility Contractor License and/or a State of Georgia Water Distribution License. A bid bond is required for bids over $250,000, along with performance and payment bonds for awarded contracts exceeding this amount. Bidders are encouraged to include DBE subcontractor participation; however, it is not mandatory.
| Contact name | Ricky Gladney |
|---|---|
| Contact email | rgladney@albanyga.gov |
| Contact phone | 229-302-1455 |
Agency: Baconton Community Charter School [GA]
Location: Georgia
NAICS: Not Provided
Agency: City of Albany [GA]
Location: Georgia
NAICS: Not Provided
Agency: City of Savannah [GA]
Location: Georgia
NAICS: Not Provided
Agency: GRIFFIN-SPALDING COUNTY SCHOOL SYSTEM [GA]
Location: Georgia
NAICS: Not Provided