Barge/vessel and crane services Corpus Christi, TX

Project ID: 1305M226Q0140 FederalOpportunitiesSynopsis Solicitation
Overview
AgencyEastern Acquisition Division
Deadline06/12/26
Posted05/28/26
Estimated Value$40,000 - $150,000 (AI estimate)
Set AsideSBA
NAICS488390 - Other Support Activities for Water Transportation
PSCN093 - Installation Of Equipment- Nonmetallic Fabricated Materials
LocationCorpus Christi, TX USA
Description
Primary Latest Change

BARGE/VESSEL AND CRANE SERVICES TO LIFT AN ALUMINUM FABRICATED FRAME ONTO A CONCRETE PIER FOR INSTALLATION FOR THE NOAA NATIONAL OCEAN SERVICE IN CORPUS CHRISTI, TEXAS This is a combined synopsis/solicitation for commercial items prepared in accordance with RFO Part 12. This announcement constitutes the only solicitation; offers are being requested and no other written solicitation will be issued. This solicitation is being issued as a total small business set-aside. The associated NAICS code is 488390. The small business size standard is $47.0M. This combined solicitation/synopsis is for purchase of the following commercial services: Barge/vessel and crane services needed for the installation of the Bob Hall Pier NWLON station elevated platform in Corpus Christ, Texas See attached full Combined Synopsis with all terms and conditions which all vendors must be in compliance with to be eligible for award. At a minimum, all quotes should include contact information and CAGE Code.

Summary (Newest Update)

Background The National Oceanic and Atmospheric Administration (NOAA) is seeking barge/vessel and crane services for the installation of an aluminum fabricated frame onto a concrete pier at the Bob Hall Pier NWLON station in Corpus Christi, Texas. This contract aims to support NOAA's mission by facilitating the installation of critical infrastructure for ocean observation. Work Details The contractor will provide all labor, equipment, and materials necessary for barge/vessel and crane services required for the installation of the elevated platform at Bob Hall Pier. The work includes lifting an aluminum fabricated frame onto a concrete pier. The contractor must comply with all terms and conditions outlined in the attached Statement of Work, which details specific tasks and requirements for successful completion of the project. Period of Performance The period of performance for the frame installation is from July 6, 2026, to July 31, 2026. Place of Performance Bob Hall Pier at 15820 Park Road 22, Corpus Christi, Texas. Bidder Requirements Bidders must be small businesses as this solicitation is a total small business set-aside. Offerors are required to submit a detailed technical approach write-up that demonstrates their understanding of the project requirements and how they plan to execute the tasks outlined in the Statement of Work. Additionally, bidders must provide at least three references for similar services to demonstrate their capability. All quotes must include contact information and CAGE Code. Incumbent Analysis (see Incumbents section for more detail) The solicitation for barge/vessel and crane services in Corpus Christi, TX appears to have a closely related prior contract, 1305M226P0011, awarded to Xenturis for $34,000 (01/26/26–07/26/26). That prior effort involved barge/vessel and crane services to install an elevated platform at the Canal NWLON station, which is similar in scope to the current requirement to lift an aluminum fabricated frame onto a concrete pier for installation of the Bob Hall Pier NWLON station elevated platform.

Contacts
Contact nameWALTON, MICHELLE
Contact emailmichelle.walton@noaa.gov
Contact phone(757) 605-7411
Same Region Opportunities