CITY OF MORRIS NORTH WATER TREATMENT PLANT (Subcontract Posting)
Agency: Subcontracts - IL [IL]
Location: Illinois
NAICS: Not Provided
| Agency | City of St Charles [IL] |
|---|---|
| Deadline | 05/21/26 |
| Posted | 05/01/26 |
| Estimated Value | $2,000,000 - $5,000,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Illinois |
In order to eliminate aging and undersized water main, 8 ductile iron main will be constructed throughout the project limits of Southgate Course, Southgate Court, and Foxwood Lane. The proposed water main is to be located beneath the roadway, and all existing watermain is to be abandoned. Water main will be installed via traditional open-cut methods and backfilled prior to the full depth reclamation within the aforementioned limits. The pavement will be removed and replaced with cement base stabilization. Longmeadow Circle includes a full-depth reclamation of the existing bituminous pavement and underlying base materials to a specified depth, and Iroquois Avenue includes pavement removal and resurfacing. Additional work includes sidewalk, curb and gutter and hydrant replacements.
Agency: Subcontracts - IL [IL]
Location: Illinois
NAICS: Not Provided
Agency: Community Impact & Enhancement [IL]
Location: Illinois
NAICS: Not Provided
Agency: Illinois Department of Human Services (DHS) [IL]
Location: Illinois
NAICS: Not Provided
Agency: NPS Midwest Region
Location: Illinois
NAICS: 236220