Food Pantry Items
Agency: Parkway Schools [MO]
Location: Missouri
NAICS: Not Provided
| Agency | Forest Service |
|---|---|
| Deadline | 04/30/26 |
| Posted | 04/06/26 |
| Estimated Value | Not Provided |
| Set Aside | SBA |
| NAICS | 237310 - Highway, Street, and Bridge Construction |
| PSC | Y1LB - Construction Of Highways, Roads, Streets, Bridges, And Railways |
| Location | Potosi, MO 63664 United States |
This is a non-personal construction contract for road improvement on the Mark Twain National Forest in Missouri.
Background The Mark Twain National Forest, managed by the USDA Forest Service, is issuing this solicitation for a non-personal construction contract aimed at improving roads within the forest in Missouri. The goal of this contract is to enhance road safety and accessibility for public use while maintaining environmental standards. Work Details The scope of work includes road reconstruction on FR 2245 over a distance of 0.9 miles, which involves various tasks such as: reconditioning ditch lines, outlets, blading, and dips; mowing and limbing vegetation along the roadway; spreading backfill material on several sections of the roadbed; placing 3-inch clean aggregate in dip areas; and applying 2-inch clean and base crushed aggregate onto sections of the roadbed. Specific tasks include: maintaining a subgrade width of 12 feet and a road base of 10 feet; mowing vegetation to a height of six inches; reconditioning all existing ditches and dips; placing specified amounts of crushed aggregate at designated mileposts; reshaping existing dips with clean rock as directed by the Contracting Officer Representative (COR); and ensuring all equipment used meets safety standards. Additionally, roadside limbing will be performed to remove overhanging limbs to a height of fourteen feet, with all cuttings disposed of appropriately. The contractor is responsible for ensuring that roads remain passable during operations and for any damage incurred during work. Period of Performance The contract period is set from June 22, 2026, through August 28, 2026. Place of Performance The construction projects will take place in Iron County, Missouri, specifically within the Potosi-Fredericktown Ranger District of the Mark Twain National Forest.
| Contact name | cynthia horwitz |
|---|---|
| Contact email | cynthia.horwitz@usda.gov |
| Contact phone | None |
Agency: Parkway Schools [MO]
Location: Missouri
NAICS: Not Provided
Agency: City of Kansas City [MO]
Location: Missouri
NAICS: Not Provided
Agency: St. Charles City [MO]
Location: Missouri
NAICS: Not Provided
Agency: Ozarks Technical Community College [MO]
Location: Missouri
NAICS: Not Provided