Ifb - Middleton Wash Trail Construction

Project ID: 26-255 State|LocalOpportunities
Overview
AgencyCity of St. George, Utah [UT]
Deadline02/05/26
Posted01/20/26
Estimated Value$1,000,000 - $5,000,000 (AI estimate)
Set AsideNot Provided
NAICSNot Provided
PSCNot Provided
LocationUtah
Description
Primary Latest Change

The City of St. George is requesting bids for construction of the Middleton Wash Trail. The project includes traffic control, removals, earthwork, storm drain, asphalt paving, concrete flatwork, trail safety rail, retaining walls, signs, pedestrian bridge, and other related work items. Every BID shall be accompanied by a bid bond in the amount of 5% of the BID, naming the City of St. George as obligee, this bid bond must be issued by a surety company licensed to do business in the State of Utah and be on a bond form acceptable to the City of St. George. The 100% performance labor and materials bond will be required on this project. The City of St. George reserves the right to reject any or all SUBMISSIONS or to waive any formality or technicality in any PROPOSAL in the interest of the city.

Summary (Newest Update)

Background The City of St. George is seeking bids for the construction of the Middleton Wash Trail, which aims to enhance local recreational opportunities and improve community access to natural areas. The project includes various construction elements necessary for developing a safe and functional trail system. Work Details The project encompasses a range of construction tasks including: traffic control, removals, earthwork, storm drain installation, asphalt paving, concrete flatwork, installation of trail safety railings, retaining walls, signage, a pedestrian bridge, and other related work items. Specific bid items include: 1) General Conditions/Mobilization; 2) Dust Control; 3) Traffic Control; 4) Clear & Grub (approx. 1.24 acres); 5) Pre-Construction Condition Documentation; 6) SWPPP Prep and BMP Items; 7) Rock Trackout Pad; 8) Silt Fence (2,105 LF); 9) Wattles (150 LF); and various earthwork and storm drain components including multiple sizes of HDPE pipes and inlets. Paving work includes asphalt installation (19,975 SF), gravel roadbase (19,975 SF), concrete sidewalk flatwork (565 SF), and trail safety rail installation (415 LF). Additionally, the project involves constructing stacked rock walls with geo-grid fabric and an 80-foot pedestrian span bridge with concrete deck. Period of Performance The contract will be performed over a specified timeframe as outlined in the bid documents, with specific milestones for completion of various phases of work. Place of Performance The construction will take place in St. George, Utah along the Middleton Wash Trail corridor. Bidder Requirements Bidders must provide a bid bond amounting to 5% of their bid value issued by a surety company licensed in Utah. A performance bond covering 100% of labor and materials will also be required upon contract award.

Contacts
Contact nameMark Goble
Contact emailmark.goble@sgcityutah.gov
Same Region Opportunities