ZION- Crawford Dam Removal and Diversion

Project ID: 140P6426B0008 FederalOpportunitiesSolicitation
Overview
AgencyNPS Midwest Region
Deadline07/08/26
Posted05/08/26
Estimated Value$1,000,000 - $5,000,000 (value based on agency estimated range)
Set AsideSBA
NAICS237990 - Other Heavy and Civil Engineering Construction
PSCZ2KA - Repair Or Alteration Of Dams
LocationZion National Park Springdale, UT USA
Description
Primary Latest Change

SOLICITATION NOTICE

The National Park Service, Central Contracting Operations, Ohio Major Acquisition Buying Office, is issuing an Invitation for Bids (IFB) for the Crawford Dam Removal project for Zion National Park in southwest Utah. The Work includes but is not limited to partial removal and disposal of an existing concrete dam and headgate structure comprised of concrete, rock, rebar, regrading of the North Fork Virgin River for a distance of approximately 300 feet, construction of a new intake structure including a fish screen, removal and disposal of approximately 275' of existing CMP pipe and concrete manhole, installation of approximately 285' of 18" ADS N-12 pipe (approximately 40' to be placed within 24" CMP pipe), removal of a concrete turnout box, reseating of an existing 12" flume, approximately 150 feet of boulder embankment rip rap and installation of approximately 350' of smart ditch

SOLICITATION NUMBER

140P6426B0008

PROJECT MAGNITUDE

Between $1,000,000 and $5,000,000

TYPE OF CONTRACT

This will be a firm-fixed price contract. Construction Wage Rate Requirements for Washington County, UT will apply. North American Industry Classification System (NAICS) CODE CLASSIFICATION and SET ASIDE: The NAICS Code is 237990, and the size standard is $45 million. This project is set aside 100% for Total Small Businesses.

SITE VISIT

See Section L in the solicitation for site visit information The contracting office will not provide hardcopies or email copies of the solicitation. REGISTRATIONS: In order to be awarded a contract, an offeror must have an UEI number. Also, the offeror must be registered and active in the System for Award Management (SAM), website at http://www.sam.gov, and have completed their Online Representations and Certifications at the time of the solicitation close date once the solicitation is posted.

POINT OF CONTACT

Christopher Bauer, Contracting Officer, christopher_bauer@ios.doi.gov, 330-468-2500 x5.

Summary (Newest Update)

Background The National Park Service, Central Contracting Operations, Ohio Major Acquisition Buying Office, is issuing an Invitation for Bids (IFB) for the Crawford Dam Removal project located at Zion National Park in southwest Utah. The agency's mission is to preserve the natural and cultural resources of the national parks while providing recreational opportunities. The goal of this contract is to remove and replace existing infrastructure to enhance environmental conditions in the area. Work Details The work includes but is not limited to: - Partial removal and disposal of an existing concrete dam and headgate structure made up of concrete, rock, and rebar; - Regrading of the North Fork Virgin River for approximately 300 feet; - Construction of a new intake structure with a fish screen; - Removal and disposal of approximately 275 feet of existing CMP pipe and concrete manhole; - Installation of approximately 285 feet of 18"Ø ADS N-12 pipe (with about 40 feet placed within a 24"Ø CMP pipe); - Removal of a concrete turnout box; - Reseating of an existing 12" flume; - Installation of approximately 150 feet of boulder embankment rip rap; - Installation of approximately 350 feet of smart ditch. Period of Performance The contractor shall begin performance within 10 calendar days after receiving the award and must complete it within 180 calendar days. Place of Performance The construction projects will be performed at Zion National Park, located in southwest Utah.

Contacts
Contact nameBauer, Christopher
Contact emailchristopher_bauer@nps.gov
Contact phone(330) 468-2500
Same Region Opportunities