Medical TPA/Network
Agency: Human Resources [KS]
Location: Kansas
NAICS: Not Provided
| Agency | City of Independence [KS] |
|---|---|
| Deadline | 06/22/26 |
| Posted | 06/01/26 |
| Estimated Value | $18,000 - $45,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Kansas |
The City of Independence, Kansas is seeking proposals from qualified licensed electrical contractors for the replacement and installation of electrical service equipment at Riverside Park. The goal of this contract is to enhance the electrical infrastructure at Riverside Park to ensure compliance with current safety standards and improve service reliability.
The selected contractor shall provide all labor, materials, equipment, permits, supervision, and incidentals necessary to complete the following work: 1. **Electrical Service Replacement** - Remove and replace the existing electrical service with a new 400-amp electrical service; Install a new exterior-rated, lockable disconnect; Install a new outdoor-rated, lockable 40-space breaker panel and new breakers; Re-connect existing power service in the breaker panel and restore all current circuits in the new panel and test. All equipment and installation methods shall comply with the 2020 National Electrical Code (NEC) and all applicable local, state, and utility requirements. 2. **Underground Electrical Service to Park Office** - Provide and install underground electrical service from the new 400 amp panel to the park office located approximately 60 feet from the service location; Contractor shall bore underground service to minimize surface disturbance; Install conduit, conductors, and all necessary connections to provide electrical service to the park office building with an exterior disconnect for the building; Restore all disturbed areas to original condition. 3. **Permits and Inspections** - Contractor shall obtain all required permits and inspections; All work shall comply with the 2020 National Electrical Code (NEC), federal, state, and local regulations; Contractor shall coordinate utility disconnects and reconnects as necessary.
The City anticipates work to begin within 14 days of contract award and be completed within 30 calendar days. The project timeline may be amended to accommodate time required for acquisition of materials.
Riverside Park, Independence, Kansas.
Contractor must hold all required licenses for electrical work in the City of Independence Kansas; Contractor shall provide proof of insurance, including general liability and workers compensation coverage; Contractor shall be responsible for all job site safety and traffic/pedestrian control if necessary.
Agency: Human Resources [KS]
Location: Kansas
NAICS: Not Provided
Agency: City of Wichita [KS]
Location: Kansas
NAICS: Not Provided
Agency: City of Wichita [KS]
Location: Kansas
NAICS: Not Provided
Agency: WaterOne [KS]
Location: Kansas
NAICS: Not Provided