Posted: May 15, 2026, 12:18 p.m. EDT
Summary: Background This contract is issued by Tinker Air Force Base (AFB) for the repair and replacement of main distribution and branch panel boards in building 6002. The objective is to ensure that the electrical systems are fully operational and compliant with applicable standards. The work is part of a larger initiative to maintain and upgrade facilities at Tinker AFB, which supports the mission of the U.S. Air Force. Work Details The contractor will perform comprehensive construction tasks including: 1. **Site Investigation**: Conduct a site investigation to verify existing conditions and obtain necessary as-built drawings from 72 ABW/CE - Engineering Support. 2. **Demolition**: Demolish existing structures as required, including interior walls, doors, ceilings, floor finishes, and electrical components such as panelboards and light fixtures. 3. **Construction**: Build new walls, install new metal doors, paint surfaces, prepare floors with densifier, and install new supply air diffusers for HVAC systems. 4. **Fire Protection**: Modify existing fire suppression systems by removing old sprinklers and installing new ones in compliance with UFC 3-600-01 standards. 5. **Electrical Work**: Disconnect and remove existing electrical circuits; install new service entrances, panelboards, grounding systems, lighting fixtures, and ensure all installations meet NEC Code requirements. 6. **Quality Control**: Implement a quality control program to monitor compliance with project specifications throughout the construction process. Place of Performance All work will be conducted at Tinker Air Force Base (AFB), Oklahoma. Incumbent Analysis (see Incumbents section for more detail) This opportunity for construction-only electrical panel board repair/replacement at Tinker AFB appears to have a confirmed incumbent base under the Tinker AFB MACC-BOA, with multiple BASIC ORDER AGREEMENT (BOA) awards running from 10/01/21–09/30/26. Confirmed BOA awardees include Maguire-Ohara Construction ($14,599,964), MIA General Contracting ($12,641,342), and Warden Construction Corporation ($9,187,490), among others, indicating prior performance of construction services at the same installation under the same ordering framework. Because this order is issued only to current MACC-BOA holders and involves site investigation and electrical system replacement work consistent with typical tasking under those BOAs, the prior awards appear to function as a continuation of the same contracting vehicle and mission support at Tinker AFB.
Current: Posted: May 29, 2026, 1:09 p.m. EDT This order proposal request is only available to current MACC-BOA holders. The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the repair/replacement of the main distribution & branch panel boards in building 6002 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information). This is a construction-only order. The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400 on Tinker AFB. The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government. Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor. This project will not require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps, or in aircraft hangers or maintenance areas. However, all contractor personnel are still required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100. IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI residing on or transiting through contractor and/or subcontractor systems. Site visit attendance is mandatory to be considered eligible for submission of proposal. RSVP email confirmation of intent to attend the site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information by 11:59 PM CST, Friday, May 22nd, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Order documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit. Attachments include an EAL spreadsheet. Please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner. If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor. The site visit is scheduled for June 3rd, 2026 at 10:00 A.M at the project performance site. More specific meeting details will be shared with contractors who have sent an RSVP. This notice also serves as the formal Synopsis for the requirement. Please contact the primary and secondary points of contact if you experience any difficulty downloading or accessing the Contractor CD documents.