Remediation and Restoration

Project ID: 6913G626Q300028 FederalOpportunitiesSynopsis Solicitation
Overview
AgencyOffice of the Secretary of Transportation
Deadline06/08/26
Posted05/22/26
Estimated ValueNot Provided
Set AsideSBA
NAICS238910 - Site Preparation Contractors
PSCF999 - Other Environmental Services
LocationBloomingdale, GA 31302 United States
Description
Primary Latest Change

The purpose of this solicitation/quote is to provide support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at two facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination sites as cited hereunder. The FAA facilities to be addressed are located in Conyers, GA and Bloomingdale, GA. The FAA's ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites. The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirementThe Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below.. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work. Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. (see SOW for more details).

Summary (Newest Update)

Background The Federal Aviation Administration (FAA) is issuing this solicitation to support its Facilities Environmental Cleanup (ECU) Program. The goal of the contract is to conduct Remedial Action (RA) at two facilities located in Conyers, GA, and Bloomingdale, GA, to address identified soil contamination sites. The FAA's ECU Program aims to mitigate potential environmental and human health risks associated with these facilities based on prior research and historical operations. Work Details The contractor will be responsible for the preparation and submission of a draft and final Remediation and Restoration Work Plan. This Work Plan must detail the technical approach and schedule for conducting contaminated soil remediation, disposal, and site restoration activities. Key tasks include: - Conducting soil remediation, disposal, and restoration activities in accordance with Federal, State, and local requirements. - Detailing disposal methods for all sites, including identifying disposal facilities for waste and debris. - Preparing a Site Safety and Health Plan (SSHP) that outlines health and safety precautions. - Including a Risk Management Plan that identifies major risks and hazards at each site with strategies to minimize them. - Submitting the draft Work Plan within ten business days of the project kick-off meeting. Period of Performance The contract will be performed from June 15, 2026, to September 30, 2026. Place of Performance The construction projects will be performed at FAA facilities located in Conyers, GA, and Bloomingdale, GA.

Contacts
Contact nameRoland Regan
Contact emailroland.regan@dot.gov
Contact phoneNone