Membrane, Paving & Guardrail Repair Bridge 12 (Moore Lane over Bloody Brook)

Project ID: 72208 State|LocalOpportunities
Overview
AgencyTown of Norwich [VT]
Deadline02/11/26
Posted01/12/26
Estimated Value$200,000 - $500,000 (AI estimate)
Set AsideNot Provided
NAICSNot Provided
PSCNot Provided
LocationVermont
Description
Primary Latest Change

The Town of Norwich, VT is seeking bids for the removal of the existing bridge pavement and approach pavement, cleanup of an emulsified asphalt that is accessible from the top of the bridge deck, and installation of new pavement, a waterproofing membrane, and approach paving. The bridge railing will need to be removed as part of the work and the Town is using the opportunity to repair the existing bridge rail and approach guardrail by replacing deteriorated rail elements. RFP documents can be obtained from the Town of Norwich website at the link below or at the Town Hall located at 300 Main Street, Norwich, VT.

Summary (Newest Update)

Background The Town of Norwich, Vermont is issuing a Request for Bid for the replacement of Culvert No. 9 located on Mitchell Brook Road. The existing culvert is undersized and in fair condition, necessitating its replacement to improve water conveyance and ensure structural integrity. Work Details The project involves the removal of the existing 24-inch diameter steel culvert and its replacement with two new culverts: 1) A 30-inch corrugated metal pipe (CMP) made of aluminized metal with a minimum 12-gauge thickness, approximately 35 feet in length, to handle ditch conveyance; 2) An 87-inch x 63-inch pipe arch CMP with a minimum 10-gauge thickness, also approximately 35 feet in length, to manage an intermittent stream. The contractor will excavate and dispose of the existing culvert and unsuitable foundation materials, including bedrock if necessary. Installation will require proper bedding material and backfill as per VTrans specifications. Erosion control measures will be implemented at the culvert inlets and outlets using erosion stone. Traffic control measures must comply with MUTCD standards. Period of Performance The project is expected to be completed no later than June 1, 2026. Place of Performance The work will be performed on Mitchell Brook Road in the Town of Norwich, Vermont. Bidder Requirements Bidders must provide a Certificate of Liability Insurance with coverage of at least $1,000,000 per occurrence and $2,000,000 aggregate. They must also include Workers Compensation Insurance. Bidders should have experience with similar projects and provide references. Compliance with OSHA trenching requirements is mandatory.

Contacts
Contact nameChris Kaufman
Contact emailckaufman@norwich.vt.us
Contact phone(802) 649-2209
Same Region Opportunities

Audit Services

Agency: Rutland Regional Planning Commission [VT]

Location: Vermont

NAICS: Not Provided