Site Effluent System

Project ID: 1333ND26RNB190022 FederalOpportunitiesSynopsis Solicitation
Overview
AgencyNational Institute of Standards and Technology
Deadline06/25/26
Posted06/09/26
Estimated Value$350,000 - $900,000 (AI estimate)
Set AsideWOSB
NAICS561210 - Facilities Support Services
PSCZ1ND - Maintenance Of Sewage And Waste Facilities
LocationGaithersburg, MD 20899 United States
Description
Primary Latest Change

BACKGROUND INFORMATION

The Gaithersburg Site Effluent Treatment System is located on the south end of campus at the E Gate intersection at Center Drive. Built in the mid-1990's, the system was designed to comply with Washington Sanitary Sewer Commission (WSSC) effluent discharge requirements. The system is centered around a large concrete tank (wet tank) that provides primary effluent treatment with a stir / chop agitator system PH monitoring and treatment. Currently, the interior wet tank operational, structural, and life safety systems have rendered this system inoperable. Inspection has found the primary floor support has detached along the south side of the wet tank. This has caused for the aluminum grating to sag, and no longer safe for personnel entry. More, there are areas of the aluminum grate that have literally rotted away. Further inspection revealed several issues. Internal blowers to address the confined space ventilation requirements are inoperable and heavily corroded. The system internal heater is inoperable and heavily corroded. The motor and stir mechanism is seized. Additionally, the motor is electrically inoperable. The explosion proof electrical wiring and conduit is in very poor condition. In general, the entire wet tank and systems needs to be renovated and brought back to operable condition. This requires a complete replacement of all tank components. This includes an entire new floor surface and all support members, safety blowers and heaters, new stir / agitation motor and shaft system, PH monitoring probes and data signaling, epoxy lining of the wet tank, lighting, electrical outlets, and demolition and replacement of all the explosion proof electrical wiring and conduit. Other work as required to conform to current regulatory requirements, as required. PURPOSE The Site Effluent Treatment System requires a complete rebuilding of all internal components to fulfill operational, regulatory, and life safety requirements.

PLACE OF PERFORMANCE

NIST Campus in Gaithersburg, Maryland.

NOTICE TO OFFERORS

Proposals are being requested in accordance to the submission requirements for Technical Approach, Schedule, and Price. Award will be made on the basis of the best value to the government

PERIOD OF PERFORMANCE

The period of performance for this project is estimated at 200 days from Notice to Proceed.

Map (Newest Update)

Loading Map Loading Map

Contacts
Contact nameSasha Bradford
Contact emailsasha.bradford@nist.gov
Contact phoneNone
Same Region Opportunities

C2 CONDENSER

Agency: Surface Forces Logistics Center

Location: Maryland

NAICS: 333414