WY CCC UPS & Breaker Replacement
Agency: USBR Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions
Location: Wyoming
NAICS: 238990
| Agency | NPS Intermountain Region |
|---|---|
| Deadline | 04/27/26 |
| Posted | 05/26/26 |
| Estimated Value | $1,000,000 - $5,000,000 (value based on agency estimated range) |
| Set Aside | WOSB |
| NAICS | 237110 - Water and Sewer Line and Related Structures Construction |
| PSC | Z2NE - Repair Or Alteration Of Water Supply Facilities |
| Location | Moose, WY 83012 United States |
Grand Teton National Park (GRTE) Replace Highlands Water and Wastewater Systems - PMIS 249645, 330091
Project work consists of providing all labor, materials, tools and other equipment necessary to complete Grand Teton National Park (GRTE) Replace Highlands Water and Wastewater Systems - PMIS 249645, 330091. Additional information is provided in the solicitation, specifications, supporting documents and other pertinent attachments. This project involves replacing the water and wastewater systems at the Highlands Historic District, located 5 miles north of Moose. Work includes extending the existing Moose water transmission line to Highlands, trenching across Cottonwood Creek using diversion and dewatering methods, replacing the internal water distribution system, and abandoning the existing well and infrastructure. The wastewater system replacement includes a new lift station, septic tank, leach field, and collection piping, with the old system decommissioned and abandoned in place. Construction will disturb approximately 2.5 acres within a 4-acre project area, with staging onsite and at Beaver Creek boneyard. Standard civil equipment will be used, and revegetation will be coordinated with park staff. Specifications and other supporting documents are attached and incorporated herein. Refer to SECTION J.
This procurement is being solicited as a Women-Owned Small Business (WOSB) - Set-Aside.
237110, Water and Sewer Line and Related Structures Construction with a small business size standard of $45M. MAGNITUDE: In accordance with FAR 36.204, the project magnitude is estimated to be between $1,000,000 and $5,000,000. DURATION: See FAR 52.211-10.
See FAR 52.236-27 for additional information.
Davis Bacon wage rates apply and are included as part of this solicitation package. SYSTEM FOR AWARD MANAGEMENT (SAM): The successful offeror must be registered in SAM and have current online Representations and Certifications. Please access http://www.sam.gov to update your records prior to submitting final offer.
Refer to Section L and M. The contractor agrees that they will follow the plans and specifications provided. Offers must be provided electronically. QUESTIONS: Any questions regarding this solicitation shall be submitted in writing to Molly Lynam, Contract Specialist, at molly_lynam@ios.doi.gov no later than ten (10) calendar days prior to the offer due date.
Background The Grand Teton National Park (GRTE) is seeking contractors to replace the Highlands Water and Wastewater Systems as part of project PMIS 249645, 330091. This project aims to enhance the water and wastewater infrastructure at the Highlands Historic District, which is located 5 miles north of Moose, Wyoming. The agency's mission includes maintaining the park's natural resources while ensuring the safety and comfort of visitors. The goal of this contract is to provide a modernized and efficient water and wastewater system that meets current standards. Work Details The contractor will be responsible for providing all labor, materials, tools, and equipment necessary for the following tasks: - Extending the existing Moose water transmission line to Highlands. - Trenching across Cottonwood Creek using diversion and dewatering methods. - Replacing the internal water distribution system. - Abandoning the existing well and infrastructure. - Replacing the wastewater system which includes installing a new lift station, septic tank, leach field, and collection piping while decommissioning and abandoning the old system in place. Construction activities will disturb approximately 2.5 acres within a 4-acre project area with staging onsite and at Beaver Creek boneyard. Standard civil equipment will be utilized, and revegetation efforts will be coordinated with park staff. Period of Performance The contract performance period is from August 3, 2026, to November 16, 2026. Place of Performance The construction projects will take place at Grand Teton National Park, specifically in the Highlands Historic District located near Moose, Wyoming.
| Contact name | Lynam, Molly |
|---|---|
| Contact email | molly_lynam@ios.doi.gov |
| Contact phone | molly_lynam@ios.doi.gov |
Agency: USBR Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions
Location: Wyoming
NAICS: 238990
Agency: USDA Office of the Chief Financial Officer
Location: Wyoming
NAICS: 334511
Agency: USFS Region 4: Intermountain Region
Location: Wyoming
NAICS: 336214
Agency: NPS Intermountain Region
Location: Wyoming
NAICS: 541990