RFI - MSHA - B1 F3-MCC Motor Control Electrical Buckets

Project ID: 1605C4-26-N-00001 FederalOpportunitiesSources Sought
Overview
AgencyDOL Office of the Assistant Secretary for Administration and Management
Deadline05/19/26
Posted05/13/26
Estimated ValueNot Provided
Set AsideNone
NAICS238210 - Electrical Contractors and Other Wiring Installation Contractors
PSCN059 - Installation Of Equipment- Electrical And Electronic Equipment Components
LocationTriadelphia, WV United States
Description
Primary Latest Change

MSHA's Approval & Certification Center, located in Triadelphia, WV, requires the services needed to replace the Motor Control Center (MCC) 2 & 3 in MSHA's A&CC's B-1 F-3 Mechanical Suite located at 765 Technology Drive, Triadelphia, WV. The Government requires these services to maintain the physical facilities where various mining products and materials are tested and certified per 30 CFR. The certification of these products and materials play a vital role in the safety and health of the industry's miners.

Summary (Newest Update)

Background The Mine Safety and Health Administration (MSHA) is responsible for enforcing compliance with safety and health standards in the mining industry. Their mission includes eliminating fatal accidents, reducing nonfatal accidents, minimizing health hazards, and promoting improved safety conditions. MSHA's Approval and Certification Center (A&CC) in Triadelphia, West Virginia, plays a vital role in testing and certifying mining products to ensure the safety of miners. The center evaluates equipment for compliance with federal regulations and issues licenses for manufacturers to produce certified products. Work Details The contractor is required to provide all personnel, equipment, tools, materials, supervision, and other necessary services to replace the Motor Control Center (MCC) 2 & 3 in the B-1 F-3 Mechanical Suite at MSHA’s A&CC. This includes the removal, disposal, installation, and testing of MCC 2 & 3 Electrical Buckets. The contractor will furnish and install replacement Eaton gear or equivalent for MCC 2 & 3 with state-of-the-art Digital Buckets. Electrical schematics of the existing MCC Electrical Buckets will be provided to assist in this process. Period of Performance The contract work must be completed within 30 days from the start date. Place of Performance The work will take place at MSHA’s Approval & Certification Center located at 765 Technology Drive, Triadelphia, WV.

Contacts
Contact nameAlicia M. Jackson
Contact emailjackson.alicia.m@dol.gov
Contact phone(202) 693-6857
Secondary contact nameMichael V. Whiddon
Secondary contact emailwhiddon.michael.v@dol.gov
Secondary contact phone(404) 302-5817
Same Region Opportunities