Grade D Air Compressor & Regenerative Air Dryer Rental

Project ID: N4215826Q0020 FederalOpportunitiesSolicitation
Overview
AgencyNaval Sea Systems Command
Deadline05/20/26
Posted05/13/26
Estimated Value$450,000 - $1,200,000 (AI estimate)
Set AsideSBA
NAICS532490 - Other Commercial and Industrial Machinery and Equipment Rental and Leasing
PSCW043 - Lease Or Rental Of Equipment- Pumps And Compressors
LocationPortsmouth, VA 23709 United States
Description
Primary Latest Change

Service rental from vendor to provide Three (3) 800 cubic feet per minute (CFM) Grade D Air Compressors, and Three (3) 930 cfm minimum Regenerative Air Dryer Units meeting the specifications outlined within the Statement of Wortk attached. Anticipated Period of Performance as follows: June 1, 2026- May 17, 2027, with (2) six-month option periods. Quotes are due on or before 05/20/2026 at 1000 AM, Eastern Standard Time. Quotations shall be emailed to Contract Specialist Eboni Uwuseba at eboni.w.uwuseba.civ@us.navy.mil and Contracting Officer Rebekah Riggins at rebekah.r.riggins.civ@us.navy.mil. Questions for clarification must be submitted by 05/18/2026 at 1000 AM, Eastern Standard Time.

Summary (Newest Update)

Background The Norfolk Naval Shipyard (NNSY) is seeking to rent equipment for the Ford Project at Pier 5A. The goal of this contract is to provide essential air compression and drying services through the rental of specific equipment that meets stringent specifications. Work Details The contractor will provide three (3) 800 cubic feet per minute (CFM) Grade D Air Compressors and three (3) Regenerative Air Dryer Units with a minimum capacity of 930 CFM. The compressors must be oil-free, rotary screw designs capable of delivering Grade D air as per CGA G-7.1 or ISO 8573-1 Class 0. Each compressor must include an electric moisture separator after the cooler, be electrically powered suitable for 460 VAC, 3-phase, 60HZ, and capable of running on a 400 amp circuit breaker. They should operate continuously outdoors and withstand exposure to weather and saltwater air, with all components meeting or exceeding NEMA Type 4 standards for outdoor use. The compressors must have fully automatic controls, alarms, and indicators requiring minimal monitoring. Period of Performance The anticipated period of performance is from June 1, 2026, to May 17, 2027, with two six-month option periods. Place of Performance The work will be performed at the Norfolk Naval Shipyard (NNSY), specifically inside the NNSY waterfront CIA area in support of the Ford Project at Pier 5A.

Contacts
Contact nameEboni Uwuseba
Contact emaileboni.w.uwuseba.civ@us.navy.mil
Contact phone(757) 396-7584
Secondary contact nameRebekah Riggins
Secondary contact emailrebekah.r.riggins.civ@us.navy.mil
Secondary contact phone(757) 967-4014
Same Region Opportunities