USCGC Alder Governor Groom

Project ID: 70Z08526Q0024896 FederalOpportunitiesSynopsis Solicitation
Overview
AgencySurface Forces Logistics Center
Deadline05/14/26
Posted05/08/26
Estimated Value$15,000 - $45,000 (AI estimate)
Set AsideSBA
NAICS336611 - Ship Building and Repairing
PSCJ020 - Maint/Repair/Rebuild Of Equipment- Ship And Marine Equipment
LocationSan Francisco, CA 94130 United States
Description
Primary Latest Change

Summary

TECHNICAL SERVICES FOR CALIBRATION OF MAIN PROPULSION DIESIL ENGINE GOVERNORS ONBOARD USCGC ALDER 1. Background: This requirement is for the contractor to calibrate both Main Propulsion Diesel Engine's (MPDE) 723+ electronic and EGB-13P mechanical governors that manage engine speed and load sharing. 2. Scope: The Contractor shall provide all personnel including technical support, labor, travel, parts, tools, and test equipment to accomplish tasks. The Contractor shall provide the services of a qualified Tech Rep, who is familiar with the Woodward 723+ electronic and EGB-13P mechanical governor controls. The Tech Rep will be responsible for the following: Advise on manufacturer's proprietary information pertinent to the system. Assist with proper repair methods and ensure compliance with manufacturer's procedures and standards during calibration of the equipment/systems. Ensure compliance with manufacturer's procedures and standards during calibration. 3. Objective: The objective of this requirement is to properly groom both Woodward 723+ electronic governors to ensure proper operation, settings, load sharing, auto declutch functions, and alarm settings/operation; and to properly groom both Woodward EGB-13P mechanical governors to ensure proper operation and settings to include proper setting of ball-head backup function and settings. 4. Tasks: The contractor shall provide labor to calibrate the governor IAW TP 3593 723+ Digital Control, and TP 3518 Main Diesel Engine Model 3608/1, to include but not limited to: 4.1. Calibrate electronic and mechanical governors 4.2. Ensure safe operation of all modes and handle positions though sea trials. 4.3. Train Coast Guard Personnel on calibration procedures and setpoints. 5. Delivery: Contractor shall provide a final report within 3 days of contract period of performance completion. 6. Government furnished property: N/A 7. Security Requirement: Base access is required. Vendor shall have a valid driver's license and show identification. A CG representative from the cutter will sponsor and escort vendor to the cutter. 8. Place of performance:

Coast Guard Sector San Francisco

1 Yerba Buena Rd. San Francisco, CA 94130 9. Period of performance: 31 May 15 June 2026, or 06-25 July 2026 10. Points of Contact: 10.1. USCG-SFLC-IBCTPL Asset Management: EMCS Daniell Hurtado, Daniell.E.Hurtado@uscg.mil, (510) 290-8808 10.2. USCGC ALDER: CWO2 Christopher Laterza, Christipher.PLaterza@uscg.mil, (801) 390-8106

Summary (Newest Update)

Background This requirement is for the contractor to calibrate both Main Propulsion Diesel Engine’s (MPDE) 723+ electronic and EGB-13P mechanical governors that manage engine speed and load sharing. The contract is issued by the U.S. Coast Guard, which aims to ensure the proper functioning of these critical systems onboard the USCGC Alder. Work Details The Contractor shall provide all personnel including technical support, labor, travel, parts, tools, and test equipment to accomplish tasks. The Contractor shall provide the services of a qualified Tech Rep, who is familiar with the Woodward 723+ electronic and EGB-13P mechanical governor controls. The Tech Rep will be responsible for advising on manufacturer's proprietary information pertinent to the system, assisting with proper repair methods and ensuring compliance with manufacturer's procedures and standards during calibration of the equipment/systems. The objective of this requirement is to properly groom both Woodward 723+ electronic governors to ensure proper operation, settings, load sharing, auto declutch functions, and alarm settings/operation; and to properly groom both Woodward EGB-13P mechanical governors to ensure proper operation and settings including proper setting of ball-head backup function. The contractor shall provide labor to calibrate the governor in accordance with TP 3593 723+ Digital Control, and TP 3518 Main Diesel Engine – Model 3608/1, which includes: calibrating electronic and mechanical governors; ensuring safe operation of all modes and handle positions through sea trials; training Coast Guard Personnel on calibration procedures and setpoints. A final report must be provided within 3 days of contract period completion. Period of Performance 31 May – 15 June 2026, or 06-25 July 2026 Place of Performance Coast Guard Sector San Francisco, 1 Yerba Buena Rd., San Francisco, CA 94130

Contacts
Contact nameLindsay Mongiovi
Contact emaillindsay.n.mongiovi@uscg.mil
Contact phone(571) 608-6752
Same Region Opportunities