WYOA Woodward Gov Cabinet Assessment

Project ID: 140R6026Q0063 FederalOpportunitiesSources Sought
Overview
AgencyUSBR Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions
Deadline05/22/26
Posted05/08/26
Estimated Value$40,000 - $120,000 (AI estimate)
Set AsideSBA
NAICS541990 - All Other Professional, Scientific, and Technical Services
PSCR425 - Support- Professional: Engineering/Technical
LocationWY USA
Description
Primary Latest Change

Audit of parts required for the sustainment of installed Woodward mechanical cabinet actuators and gate shaft governors

Summary (Newest Update)

Background The Bureau of Reclamation, Wyoming Area Office (WYAO), is issuing a contract for an audit of parts required for the sustainment of installed Woodward mechanical cabinet actuators and gate shaft governors at various power plants including Seminoe, Kortes, Fremont Canyon, Alcova, Glendo, Guernsey, Boysen, Shoshone, Buffalo Bill, Spirit Mountain, and Heart Mountain. The goal is to ensure the proper functioning and maintenance of these critical components through a thorough assessment conducted by knowledgeable representatives. Work Details The contractor shall provide knowledgeable representatives, materials, transportation, and equipment to conduct an audit of the Woodward materials installed and inventory spare materials at each facility. The contractor must adhere to the standards defined in Section 5 of the Performance Work Statement (PWS). Services must be scheduled through the Field Office’s Maintenance Management Scheduling Coordinator (MMSC) or Maintenance Planner. The assessment includes: - Audit and record material needs for periodic governor disassembly, refurbishment, and restoration for three power generation units at Seminoe Power Plant. - Inventory and record spare materials maintained. - Remove all equipment and waste material from the area. - Identify any concerns to the escort or Point of Contact. Period of Performance The contract will be performed over a specified period as outlined in the solicitation but is not detailed in this summary. Place of Performance The contract will be performed at multiple locations in Wyoming including Seminoe Power Plant, Kortes Power Plant, Fremont Power Plant, Alcova Power Plant, Glendo Power Plant, Guernsey Power Plant, Boysen Power Plant, Shoshone Power Plant, Buffalo Bill Power Plant, Spirit Mountain Power Plant, and Heart Mountain Power Plant.

Contacts
Contact nameOakes, Sydney
Contact emailskessel@usbr.gov
Contact phone(406) 233-3647
Same Region Opportunities