Renovate Pharmacy for USP800 Compliance Project Number 540-18-107

Project ID: 36C24526B0001 FederalOpportunitiesSolicitation
Overview
AgencyVISN 5: Capitol Health Care Network
Deadline05/20/26
Posted04/29/26
Estimated Value$500,000 - $1,500,000 (AI estimate)
Set AsideNone
NAICS236220 - Commercial and Institutional Building Construction
PSCZ1DA - Maintenance Of Hospitals And Infirmaries
LocationLouis A. Johnson VA Medical Center Clarksburg, WV USA
Description
Primary Latest Change

Posted: March 25, 2026, 4:34 p.m. EDT 36C24526B0001 Solicitation for construction for Upgrade Pharmacy to USP 800 Standards

Summary (Newest Update)

Background The Department of Veterans Affairs is issuing this solicitation for the construction project aimed at upgrading the pharmacy at the Louis A. Johnson VA Medical Center in Clarksburg, WV, to comply with USP 800 standards. The goal of this contract is to ensure that the inpatient pharmacy mixing rooms meet the necessary safety and health regulations for handling hazardous drugs, thereby enhancing patient safety and operational efficiency within an active medical center. Work Details The contractor will be responsible for a comprehensive renovation of the existing inpatient pharmacy, which includes site preparation, demolition, and construction tasks as follows: 1. Site Preparation: Conduct thorough assessments and prepare the site for building operations. 2. Demolition: Carefully remove existing structures and utilities while minimizing disruption to hospital operations. 3. Construction: Renovate the pharmacy according to specifications, including installing non-porous flooring, constructing smooth walls with epoxy finishes, implementing HVAC systems with HEPA filtration, retrofitting plumbing systems for chemical waste handling, and converting adjacent shell space into functional areas. 4. Temporary Containment: Create a segregated compounding area that meets USP standards. 5. Compliance: Ensure all work adheres to local, state, and federal regulations regarding construction and safety protocols. Period of Performance The duration of this project is set for 496 days from the start date. Place of Performance All construction activities will take place at the Louis A. Johnson VA Medical Center located in Clarksburg, West Virginia.

2: Posted: April 2, 2026, 2:22 p.m. EDT 36C2452B0001 Renovate Pharmacy for USP 800 Compliance
3: Posted: April 20, 2026, 2:50 p.m. EDT 36C2452B0001 Renovate Pharmacy for USP 800 Compliance
Current: Posted: April 29, 2026, 5:18 p.m. EDT 36C2452B0001 Renovate Pharmacy for USP 800 Compliance
Contacts
Contact nameRebecca L Besten
Contact emailrebecca.besten@va.gov
Contact phoneNone
Same Region Opportunities