2026 Utility Vehicle
Agency: City of Andover [KS]
Location: Kansas
NAICS: Not Provided
| Agency | Derby [KS] |
|---|---|
| Deadline | 05/12/26 |
| Posted | 04/29/26 |
| Estimated Value | $500,000 - $1,500,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Kansas |
OWNER: CITY OF DERBY, KANSASADDRESS: 611 N. MULBERRY, SUITE 300, DERBY, KANSAS 67037 Separate sealed BIDS for the construction of PAVING & SIDEWALK IMPROVEMENTS to serve COURTYARDS AT CROSSWATER SECOND ADDITION, PH 1, DERBY, SEDGWICK COUNTY, KANSAS will be received by the City of Derby at Derby City Hall, 611 N. Mulberry, Suite 300 Derby, Kansas 67037 until 2:00 p.m., Tuesday, May 12, 2026 and then at said office will be publicly opened and read aloud. The project is briefly described as follows: PAVING IMPROVEMENTS PH 1; RES. 14-2025ARTERIAL PAVING IMPROVEMENTS; RES. 19-2025SIDEWALK IMPROVEMENTS PH 1; RES. 23-2025 The CONTRACT DOCUMENTS MAY BE EXAMINED AT THE FOLLOWING LOCATIONS: Derby City Hall, 611 N. Mulberry, Suite 300, Derby, Kansas 67037 Questions or clarifications regarding the bid documents should be directed to Ky Louanghaksaphone at Ext. 1255 or emailed to CONTRACT DOCUMENTS may be obtained from the Engineering Design Firm: MKEC; 316-684-9600
Bidders on this work will be required to comply with the President's Executive Order No. 11246. Requirements for bidders and contractors under this order are explained in the specifications. Proposals must be accompanied by a certified or cashier's check, or bid bond is acceptable to the City in an amount not less than five percent (5%) of the proposal. Checks are to be made payable to the City of Derby and drawn on a solvent Kansas Bank or Trust Company. These checks or bonds are to be retained by the City Clerk until the contract for the project shall have been awarded. Kiel Mangus, City Manager DATE
Background The City of Derby, Kansas is issuing a solicitation for the construction of paving and sidewalk improvements to serve the courtyards at CrossWater Second Addition, Phase 1, located in Derby, Sedgwick County, Kansas. The project aims to enhance infrastructure in the area as part of ongoing development efforts. Work Details The project includes three main components: Paving Improvements Phase 1, Arterial Paving Improvements, and Sidewalk Improvements Phase 1. Specific tasks include: **Paving Improvements Phase 1:** - Earthwork (1 LS) - 5" AC Pavement (4792 SY) - 7" Reinforced Concrete Valley Gutter (108 SY) - 5" Geogrid Reinforced Rock Base (6602 SY) - 6" Reinforced Concrete Pavement (1082 SY) - Curb & Gutter (6 5/8") (1207 LF) - Wheelchair Ramps with Detectable Warning Pavers (4 EA) - Various types of curb inlets and drainage structures. **Arterial Paving Improvements:** - Earthwork (1 LS) - 6" AC Pavement (6779 SY) - 8" Geogrid Reinforced Rock Base (8809 SY) - Curb & Gutter installations including median curbs and driveways. **Sidewalk Improvements Phase 1:** - Concrete Sidewalk (4") (4925 SF) - Wheelchair Ramps with Detectable Warnings (2 EA) - Site Clearing & Restoration (1 LS). Period of Performance The contract work is scheduled to be performed until May 12, 2026. Place of Performance The work will be conducted at CrossWater Second Addition, Phase 1, Derby, Sedgwick County, Kansas. Bidder Requirements Bidders must comply with the President’s Executive Order No. 11246 regarding nondiscrimination in employment. Proposals must include a certified or cashier’s check or bid bond of at least five percent (5%) of the proposal amount.
| Contact name | Ky Louanghaksaphone |
|---|---|
| Contact email | kylouanghaksaphone@derbyks.gov |
Agency: City of Andover [KS]
Location: Kansas
NAICS: Not Provided
Agency: Kansas National Guard
Location: Kansas
NAICS: 311999
Agency: VISN 15: Heartland Network
Location: Kansas
NAICS: 811310
Agency: Air Mobility Command
Location: Kansas
NAICS: 517112