Lake Alva Campground Improvements

Project ID: 1240LU26Q0055 FederalOpportunitiesSynopsis Solicitation
Overview
AgencyUSFS Region 1: Northern Region
Deadline05/28/26
Posted04/29/26
Estimated Value$500,000 - $1,000,000 (value based on agency estimated range)
Set AsideSBA
NAICS238990 - All Other Specialty Trade Contractors
PSCZ2PA - Repair Or Alteration Of Recreation Facilities (Non-Building)
LocationSeeley Lake, MT United States
Description
Primary Latest Change

Lolo National Forest Alva Lake Camground improvements. The Campground is approximately 60 miles north of Missoula, MT along highway 83. This project replaces the existing water system, electrical system, and re-paves a loop of the Lake Alva Campground. The magnitude of the project is between 500,000 and 1,000,000.

Summary (Newest Update)

Background The Lolo National Forest, managed by the USDA Forest Service, is seeking improvements to the Lake Alva Campground located approximately 60 miles north of Missoula, MT along highway 83. The goal of this contract is to enhance the campground facilities by replacing the existing water and electrical systems and repaving sections of the campground road. The project magnitude is estimated to be between $500,000 and $1,000,000. Work Details The contractor will be responsible for replacing all water system components in the well pumphouse, which includes new pressure tanks, flow meters, pressure relief valves, and all necessary appurtenances. Additionally, a new 2" HDPE water main will be installed throughout the campground while abandoning the existing water main in place. Electrical upgrades will also be performed throughout the campground involving demolition of existing equipment, installation of new grounding equipment, low-voltage power conductors and cables, cable conduits, box connectors, couplers, new power outlet pedestals, and circuit breakers. Option Item #1 includes repaving sections of the asphalt road within the campground, patching areas where the new water main intersects with the road, and replacing some existing wheel stops in designated parking areas. Period of Performance The contract work is expected to commence on July 1, 2026, and will continue until December 1, 2027. Place of Performance Lake Alva Campground located in Seeley Lake Ranger District in Montana.

Contacts
Contact nameJohn Curry
Contact emailjohn.curry@usda.gov
Contact phone(605) 673-9216
Same Region Opportunities