London Locks and Dam Pier House Roof Replacements

Project ID: W9123726QA041 FederalOpportunitiesSolicitation
Overview
AgencyUSACE Huntington District
Deadline04/28/26
Posted04/24/26
Estimated Value$250,000 - $500,000 (AI estimate)
Set AsideSBA
NAICS238160 - Roofing Contractors
PSCZ2AZ - Repair Or Alteration Of Other Administrative Facilities And Service Buildings
LocationLondon Locks and Dam; US Route 60, London, WV 25126 London, WV 25126 USA
Description
Primary Latest Change

Contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to completely remove and replace the roof systems on five (5) pier house structures and the Operations Building at the London Locks and Dam facility. This project requires the installation of new plywood sheathing, 30 lb felt underlayment, and new asphalt shingle system to restore watertight integrity, ensure long-term structural reliability, extend the service life of the facilities, and reduce future maintenance needs. The Operations Building and Pier House 1 roofs serve as the base requirement for this contract, with the remaining 4 pier houses being the Option 1 requirement.

Summary (Newest Update)

Background The project is issued by the U.S. Army Corps of Engineers, Huntington District, with the goal of maintaining and enhancing the structural integrity of the London Locks and Dam facility in London, WV. The contract focuses on roof replacements to ensure long-term reliability and reduce maintenance needs. Work Details The contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to completely remove and replace the roof systems on five (5) pier house structures and the Operations Building at the London Locks and Dam facility. This includes: - Installation of new plywood sheathing; - Application of 30 lb felt underlayment; - Installation of a new asphalt shingle system to restore watertight integrity; - Ensuring long-term structural reliability; - Extending the service life of the facilities; - Reducing future maintenance needs. The Operations Building and Pier House 1 roofs serve as the base requirement for this contract, while the remaining four pier houses are considered an option. Period of Performance The contractor shall begin performance within 7 calendar days and complete it within 15 calendar days after receiving award notice to proceed. Place of Performance London, WV

Contacts
Contact nameKatrina Lazare
Contact emailkatrina.d.lazare@usace.army.mil
Contact phone(304) 399-5183
Same Region Opportunities