DK Heart Butte Dam Safety Modification

Project ID: 140R6026R0004 FederalOpportunitiesSolicitation
Overview
AgencyUSBR Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions
Deadline05/29/26
Posted04/14/26
Estimated Value$20,000,000 - $50,000,000 (AI estimate)
Set AsideNone
NAICS237990 - Other Heavy and Civil Engineering Construction
PSCZ2PZ - Repair Or Alteration Of Other Non-Building Facilities
LocationHeart Butte, MT USA
Description
Primary Latest Change

Summary

Posted: April 13, 2026, 2:15 p.m. EDT

DK Heart Butte Dam Safety Modification

Please see the attachments entitled "Solicitation 140R6026R0004 4.13.26" and "03B_00 00 02_Drawings 11x17" for the full solicitation details. A copy of the 2018-2021 Heart Butte Dam Corrective Action Study Geologic Exploration Report can be requested from the Contracting Specialist at mitchell_frost@ios.doi.gov.

Summary (Newest Update)

Background The Bureau of Reclamation is issuing this solicitation for the Heart Butte Dam Safety Modification project. The agency's mission is to manage water resources in the western United States, and this contract aims to enhance the safety and structural integrity of the Heart Butte Dam, ensuring it meets current safety standards. Work Details The contractor will be responsible for the repair or alteration of non-building facilities at the Heart Butte Dam. Key tasks include: 1. Installation of dewatering wells and observation wells as part of a water control system. 2. Construction access planning, including haul routes and access roads. 3. Implementation of temporary work features such as cofferdams to facilitate construction activities. 4. Sequencing of construction tasks to ensure compliance with project specifications and restrictions. 5. Maintenance of accurate records related to safety incidents and compliance with OSHA guidelines. Period of Performance The contract will commence on December 31, 2026, and is expected to conclude by April 30, 2030. Place of Performance The construction projects will take place at the Heart Butte Dam located in Montana.

Current: Posted: April 14, 2026, 2:53 p.m. EDT DK Heart Butte Dam Safety Modification Please see the attachments entitled "Solicitation 140R6026R0004 0001 4.14.26" and "03B_00 00 02_Drawings 11x17" for the full solicitation details. A copy of the 2018-2021 Heart Butte Dam Corrective Action Study Geologic Exploration Report can be requested from the Contracting Specialist at mitchell_frost@ios.doi.gov.
Contacts
Contact nameStephens, Travis
Contact emailtjstephens@usbr.gov
Contact phone(406) 247-7812
Same Region Opportunities