Description
Primary Latest Change

Shell Falls Primary Power

The project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight, delivery, and all necessary valid licenses and permits required to complete the improvements at the Bighorn National Forest, Shell Falls Wayside addressing the site s primary power supply. This project aims to address on-site generated power, wastewater system revisions and water system reinstallation IAW the Statement of Work, drawings and applicable specifications. NAICS:237990. NAICS Small Business Size Standard: $45M Magnitude of Construction is between $1,000,000 and $5,000,000 This is solicited 100% Small Business

Organized Site Visit

Name: Christopher Wolffing Address: Approximately 26 miles east of Greybull, and 69 miles west of Sheridan, along U.S. Highway 14 in Bighorn County, Wyoming. The site legal description is the East 1 2 Section 7, T53N, R89W.

Date and Time

April 1, 2026, 10:00 AM Mountain Telephone: 307-674-2647 Email: Christopher.wolffing@usda.gov Questions shall be submitted via email to erick.plamann@usda.gov and are due no later than April 8, 2026, at 12:00 PM Central Time. No other means will be accepted

Summary (Newest Update)

Background The Shell Falls Primary Power project is initiated by the U.S. Forest Service (USFS) to improve the primary power supply at the Bighorn National Forest, specifically at the Shell Falls Wayside. The project aims to enhance on-site generated power, revise the wastewater system, and reinstall the water system in accordance with the Statement of Work, drawings, and applicable specifications. Work Details The contractor will be responsible for supplying all labor, materials, equipment, miscellaneous items, freight, delivery, and all necessary valid licenses and permits required to complete improvements at the site. The specific tasks include: - Addressing on-site generated power systems - Revising wastewater systems - Reinstalling water systems All work must comply with the provided Statement of Work and applicable specifications. Period of Performance The estimated period of performance for this contract is 540 days after receiving the Notice to Proceed (NTP). Place of Performance The construction projects will be performed at Bighorn National Forest, Shell Falls Wayside, located approximately 26 miles east of Greybull and 69 miles west of Sheridan along U.S. Highway 14 in Bighorn County, Wyoming.

Contacts
Contact nameErick Plamann
Contact emailerick.plamann@usda.gov
Contact phoneNone
Secondary contact nameLucas Dahlman
Secondary contact emaillucas.dahlman@usda.gov
Secondary contact phoneNone