2026 LMIG/TSPLOST Road Resurfacing Project

Project ID: 68800 LEE PE-68800-NONST-2026-000000010 State|LocalOpportunities
Overview
AgencyLee County Board of Commissioners [GA]
Deadline05/05/26
Posted04/06/26
Estimated Value$1,500,000 - $3,000,000 (AI estimate)
Set AsideNot Provided
NAICSNot Provided
PSCNot Provided
LocationGeorgia
Description
Primary Latest Change

The Lee County Board of Commissioners is accepting sealed written bids from qualified contractors for road resurfacing services for the following 12 roads in Lee County: Winifred Road from the Dougherty County Line to Cookville Road, Oakland Parkway from U.S. 82 to the Roundabout, Pinewood Road from the previous paving project (Deer Run) to U.S. 19, Mossy Dell Road from New York Road to S.R. 32., Graves Springs Road from S.R. 32 to Forrester Parkway, and all of the Canterbury Subdivision including the full length of Greyfriars Ln., Churchill Cir., Daughtry Ln., Ashwood Ct., Thimblemill Dr., Battersea Ct., and Ferrell Ct. In general, these roads are to be patched as directed by Engineer, leveled with either 100 lbs / sy of OGI or 85 lbs/sy of 9.5 mm asphalt and topped with either 165 lbs/sy of 12.5 mm asphalt or 135 lbs/sy of 9.5 mm asphalt overlay. Winifred Road is to be widened by milling a minimum 9 into the existing edge of asphalt to redevelop the edge of pavement. Mossy Dell Road is to be widened by milling a minimum 12 into the existing edge of asphalt to redevelop the edge of pavement. Forrester Parkway will be restriped from State Route 133 to Philema Road. Other included items are high build traffic striping, rumble strips, stop bars, shoulder grading and other misc. items pertaining to the project.

Summary (Newest Update)

Background The Lee County Board of Commissioners is issuing this Invitation to Bid for the 2026 LMIG/TSPLOST Road Resurfacing Project. The project aims to enhance the road infrastructure within Lee County by resurfacing twelve specific roads, thereby improving safety and accessibility for residents and visitors. The agency's mission is to maintain and improve the county's transportation network. Work Details The contractor will provide road resurfacing services for the following roads: - Winifred Road (2.62 miles) - Oakland Parkway (0.87 miles) - Pinewood Road (2.96 miles) - Mossy Dell Road (2.89 miles) - Graves Springs Road (5.19 miles) - All streets in the Canterbury Subdivision including Greyfriars Ln., Churchill Cir., Daughtry Ln., Ashwood Ct., Thimblemill Dr., Battersea Ct., and Ferrell Ct. The work includes patching, leveling with either 100 lbs/sy of OGI or 85 lbs/sy of 9.5 mm asphalt, topping with either 165 lbs/sy of 12.5 mm asphalt or 135 lbs/sy of 9.5 mm asphalt overlay, widening specific roads by milling into existing asphalt, restriping Forrester Parkway, and other miscellaneous items such as high build traffic striping, rumble strips, stop bars, shoulder grading, and erosion control measures. Period of Performance The contractor must begin work within 90 calendar days of receiving written notification from the County to proceed and must complete all work by 5:00 PM, 90 days from that notice. Place of Performance The contract will be performed in various locations throughout Lee County, Georgia, specifically on the listed roads. Bidder Requirements Bidders must be Georgia Department of Transportation certified and are required to submit a bid bond or cashier’s check for 10% of the bid amount. Successful bidders must provide proof of workers’ compensation insurance, general liability insurance ($1 million), automobile liability insurance ($1 million), performance bond, payment bond, drug-free workplace certification, SAVE Affidavit, Contractor’s Affidavit, Subcontractor’s Affidavit, and a signed contract prepared by the County.

Contacts
Contact nameBrent Davis
Contact emailbrent@reliableeng.net
Contact phone(229) 224-3299