Colville National Forest -GAOA Sullivan Lake Swim Dock Replacement

Project ID: 1240BD26Q0003 FederalOpportunitiesSynopsis Solicitation
Overview
AgencyUSFS Region 6: Pacific Northwest Region
Deadline03/11/26
Posted02/24/26
Estimated Value$70,000 - $150,000 (AI estimate)
Set AsideSmall Business
NAICS238990 - All Other Specialty Trade Contractors
PSC1945 - Pontoons And Floating Docks
LocationMetaline Falls, WA 99153 United States
Description
Primary Latest Change

Requirement Overview

The U.S. Department of Agriculture (USDA), Forest Service, Colville National Forest (CNF), has a requirement for the Great American Outdoors Act (GAOA). This is a firm-fixed-price, non-personal services contract for the removal and disposal of an existing swim dock and the furnishing and installation of a new replacement swim dock at the Sullivan Lake Campground in Metaline Falls, WA.

Project Scope

The contractor shall provide all labor, materials, equipment, and supervision to perform the following: - Removal & Disposal: Complete removal of the existing swim dock (currently on dry ground) and off-site disposal at a legal waste facility in accordance with Washington State regulations.

New Dock Installation

Furnishing, transporting, and anchoring a new swim dock designed for seasonal water level fluctuations and high-wind conditions.

Salient Characteristics

- Dimensions: Minimum 15'x15' to Maximum 16'x16'. - Construction: Marine-grade aluminum or galvanized steel frame with encapsulated foam flotation. - Decking: Non-slip composite (light grey or cedar tone) with black dock edging.

Safety Features

4-to-5 step detachable swim ladder; flush coupling systems with rubber covers (if delivered in sections). - Anchoring: Flexible chain/fastener system for rocky/sand bottom (approx. 30ft depth) capable of withstanding peak wind events. - Lighting: Solar-powered LED lights on each corner. - Freeboard: 12 to 18 under dead load.

Estimated Start

April 2026

Completion Date

No later than September 1, 2026. - Coordination: Installation must be coordinated with the Contracting Officer's Representative (COR) to align with optimal water levels.

Place of Performance

Sullivan Lake Campground, Metaline Falls, WA 99153.

Solicitation Details

This solicitation is issued as a Combined Synopsis/Solicitation. All responsible sources may submit a quotation which shall be considered by the agency. Vendors must be registered in the System for Award Management (SAM) to be eligible for award. Invoices must be submitted via the Invoice Processing Platform (IPP). See attachments for details.

Summary (Newest Update)

Background The U.S. Department of Agriculture (USDA), Forest Service, Colville National Forest (CNF), is issuing a contract under the Great American Outdoors Act (GAOA) for the removal and disposal of an existing swim dock and the installation of a new swim dock at Sullivan Lake Campground in Metaline Falls, WA. The goal of this contract is to enhance recreational facilities while ensuring compliance with environmental regulations. Work Details The contractor is required to provide all labor, materials, equipment, and supervision for the following tasks: 1. Removal & Disposal: Complete removal of the existing swim dock currently on dry ground and off-site disposal at a legal waste facility in accordance with Washington State regulations. 2. New Dock Installation: Furnishing, transporting, and anchoring a new swim dock designed for seasonal water level fluctuations and high-wind conditions. The new dock must meet the following salient characteristics: - Dimensions: Minimum 15’x15’ to Maximum 16’x16’. - Construction: Marine-grade aluminum or galvanized steel frame with encapsulated foam flotation. - Decking: Non-slip composite (light grey or cedar tone) with black dock edging. - Safety Features: 4-to-5 step detachable swim ladder; flush coupling systems with rubber covers if delivered in sections. - Anchoring: Flexible chain/fastener system for rocky/sand bottom (approx. 30ft depth) capable of withstanding peak wind events. - Lighting: Solar-powered LED lights on each corner. - Freeboard: 12” to 18” under dead load. Period of Performance Estimated Start: April 2026; Completion Date: No later than September 1, 2026. Place of Performance Sullivan Lake Campground, Metaline Falls, WA 99153.

Contacts
Contact nameMindy Hickman
Contact emailmindy.hickman@usda.gov
Contact phoneNone
Same Region Opportunities