AATTC Trailer Reconfiguration

Project ID: W50S7G26RA005 FederalOpportunitiesSolicitation
Overview
AgencyDepartment of the Army
Deadline01/27/26
Posted01/08/26
Estimated ValueNot Provided
Set AsideSmall Business
NAICS236220 - Commercial and Institutional Building Construction
PSCY1AZ - Construction Of Other Administrative Facilities And Service Buildings
LocationSaint Joseph, MO 64503 United States
Description
Primary Latest Change

Summary

Posted: Jan. 8, 2026, 3:42 p.m. EST

AATTC North and South Trailer Reconfiguration

Phase 1 involves interior facility upgrades to AATTC South trailers. Phase 2 focuses on exterior facility upgrades to the AATTC South trailers. Phase 3 - Decommission and remove North trailer group from base and repairs to the existing decking that joined North and South trailer groups, construction of new guardrail and stairs on decking, removal of cameras and low-voltage wiring from North trailers, removal of North trailer skirting and lockable access panel.

Summary (Newest Update)

Background The AATTC North and South Trailer Reconfiguration project is initiated to enhance the security, functionality, and resilience of the Air National Guard (ANG) infrastructure. The project aims to upgrade existing facilities and decommission outdated structures to meet current operational needs. Work Details The project consists of three phases: Phase 1 involves interior upgrades to the AATTC South trailers, including converting an existing room into a SIPR café with new SIPR ports, cabinet relocation, compliant cabling systems, redirected power, and updated door access. Phase 2 focuses on exterior improvements to the South trailers, which include installing a continuous vapor barrier, insulating piping with heat tape, adding lockable access panels, sealing the building envelope, and installing a new awning for energy efficiency and weather protection. Phase 3 entails the decommissioning and removal of the North trailer group from the base. This includes disconnecting utilities (electrical, gas, water, sewer), removing cameras and low-voltage wiring from North trailers, dismantling skirting and lockable access panels, repairing existing decking with new guardrails and stairs for safe access. All work must comply with applicable state and federal laws, ANG policies, and regulations. Place of Performance The construction projects will be performed at the AATTC facility.

4: Posted: Jan. 22, 2026, 2:55 p.m. EST AATTC North and South Trailer Reconfiguration Phase 1 involves interior facility upgrades to AATTC South trailers. Phase 2 focuses on exterior facility upgrades to the AATTC South trailers. Phase 3 - Decommission and remove North trailer group. 09 Jan 2026 - Added missing document. 21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time. 22 Jan 2026 - Uploaded Amendment 0001 and Revision 01 of the Statement of Work. Please have completed background check forms submitted to MSgt Glise by 10AM Local Time on January 23rd, 2026.
5: Posted: Jan. 28, 2026, 8:59 p.m. EST AATTC North and South Trailer Reconfiguration Phase 1 involves interior facility upgrades to AATTC South trailers. Phase 2 focuses on exterior facility upgrades to the AATTC South trailers. Phase 3 - Decommission and remove North trailer group. 09 Jan 2026 - Added missing document. 21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time. 22 Jan 2026 - Uploaded Amendment 0001 and Revision 01 of the Statement of Work. Please have completed background check forms submitted to MSgt Glise by 10AM Local Time on January 23rd, 2026. 28 Jan 2026 - Uploaded Solicitation W50S7G26RA0050002 conformed, Amendment 0002, Revision 02 of the Statement of Work, Question and Answers dated 28 January 2026 and three photos (decking north trailer side, decking south trailer side and additional floor box). *** NOTE: Solicitation W50S7G25RA0050002 Conformed contains revised contract line item descriptions for proposal pricing.***
Current: Posted: Jan. 29, 2026, 11:33 a.m. EST AATTC North and South Trailer Reconfiguration Phase 1 involves interior facility upgrades to AATTC South trailers. Phase 2 focuses on exterior facility upgrades to the AATTC South trailers. Phase 3 - Decommission and remove North trailer group. 09 Jan 2026 - Added missing document. 21 Jan 2026 - Uploaded Pre-Proposal Conference Slides titled: "B7-ULYB262003 AATTC Trailers Reconfigure and Removal_PP 1, Uploaded Pre-proposal SignIn Sheet and adjusted proposal due date to January 30th at 10AM Local Time. 22 Jan 2026 - Uploaded Amendment 0001 and Revision 01 of the Statement of Work. Please have completed background check forms submitted to MSgt Glise by 10AM Local Time on January 23rd, 2026. 28 Jan 2026 - Uploaded Solicitation W50S7G26RA0050002 conformed, Amendment 0002, Revision 02 of the Statement of Work, Question and Answers dated 28 January 2026 and three photos (decking north trailer side, decking south trailer side and additional floor box). *** NOTE: Solicitation W50S7G25RA0050002 Conformed contains revised contract line item descriptions for proposal pricing.*** 29 Jan 2026 - Uploaded Sign-in sheet from the Site Visit held on January 27th, 2026. Uploaded an informational drawing for the south trailer group, "ULYB262003 South Trailer Group First Floor Plan"
Contacts
Contact nameMSgt Amanda Glise
Contact emailamanda.glise@us.af.mil
Contact phone(816) 236-3032
Secondary contact nameAdam D. Danner
Secondary contact emailadam.danner.1@us.af.mil
Secondary contact phone(816) 236-3256
Same Region Opportunities

SPS Compressor

Agency: VISN 15: Heartland Network

Location: Missouri

NAICS: 339113