CLIN STRUCTURE FOR PUBLIC FEEDBACK - LOCK AND DAM 25 NEW 1, 200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
Agency: USACE St. Louis District
Location: Missouri
NAICS: 237990
| Agency | USACE St. Louis District |
|---|---|
| Deadline | 03/31/26 |
| Posted | 01/15/26 |
| Estimated Value | $25,000,000 - $50,000,000 (value based on agency estimated range) |
| Set Aside | None |
| NAICS | 237990 - Other Heavy and Civil Engineering Construction |
| PSC | Y1PZ - Construction Of Other Non-Building Facilities |
| Location | Lock and Dam 25, Winfield, MO 63389 63389 |
Posted: Jan. 15, 2026, 2:37 p.m. EST The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.
Posted: Jan. 22, 2026, 12:29 p.m. EST The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed. ---- Presolicitation Synopsis Update 0001 - update the POP information.
| Contact name | Angie Grimes |
|---|---|
| Contact email | angie.l.grimes@usace.army.mil |
| Contact phone | (314) 331-8965 |
| Secondary contact name | Whitney Dee |
| Secondary contact email | whitney.r.dee@usace.army.mil |
| Secondary contact phone | (314) 332-8621 |
Agency: USACE St. Louis District
Location: Missouri
NAICS: 237990
Agency: USGS Office of Acquisitions and Grants
Location: Missouri
NAICS: 333914
Agency: DLA Land and Maritime
Location: Missouri
NAICS: Not Provided
Agency: DLA Land and Maritime
Location: Missouri
NAICS: Not Provided