Background
The Town of Rochester is issuing a solicitation for the replacement of the Boice Mill Road Bridge (BIN 2224460) over Falls Mill Brook. This project is part of a Federal Aid initiative aimed at enhancing infrastructure within the town, ensuring safety and accessibility for residents and travelers. The work site is located within the Town of Rochester, specifically extending from 125 feet south of the Boice Mill Bridge to 325 feet south of the Dunn Farm Road and Boice Mill intersection.
Work Details
The contract includes providing all labor, materials, machinery, tools, equipment, and other means necessary for construction as per the specifications. Key tasks include: - Replacement of the existing steel jack arch bridge with a 42-foot clear span precast three-sided structure. - Installation of spread footing and drilled shaft foundations. - Construction of stone-faced concrete parapets and moment slabs. - Compliance with NYSDOT Standard Specifications finalized on May 1, 2026.
Period of Performance
The work will be substantially completed within 365 calendar days from the Notice to Proceed and is expected to be ready for final payment by September 30, 2027.
Place of Performance
The project will be performed in the Town of Rochester, New York.
Bidder Requirements
There are no specific MBE/WBE/SDVOB goals for this project. However, bidders must be registered with the NYS Department of Labor prior to submitting a bid. The successful bidder will need to furnish Performance and Payment Bonds for an amount not less than 100% of the accepted bid and must have an approved CCA-2 on file with NYSDOT prior to contract award.