Weeks Brook Bridge Railing Repair, Franklin Falls Dam, Sanbornton, NH

Project ID: W912WJ26QA100 FederalOpportunitiesSolicitation
Overview
AgencyUSACE New England District
Deadline06/08/26
Posted06/02/26
Estimated Value$25,000 - $100,000 (value based on agency estimated range)
Set AsideSBA
NAICS237310 - Highway, Street, and Bridge Construction
PSCY1LB - Construction Of Highways, Roads, Streets, Bridges, And Railways
LocationSanbornton, NH USA
Description
Primary Latest Change

THE WORK CONSISTS OF

The Contractor shall furnish all labor, materials, and equipment for the complete removal of the existing bridge railing and posts at Weeks Brook Bridge. The work includes the installation of a new railing system, anchored to the superstructure as detailed in the contract drawings. The new railing posts and guardrails shall conform to the standard details and specifications of the New Hampshire Department of Transportation (NHDOT). However, the connections of these components to the existing bridge superstructure shall be executed in accordance with the project-specific designs. The magnitude of construction is between $25,000 and $100,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil) This procurement is set-aside for small business vendors. The applicable NAICS code is 237310 with a Small Business Size Standard of $45 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.

Map (Newest Update)

Loading Map Loading Map

Summary: Background The U.S. Army Corps of Engineers is issuing this contract for the repair of the Weeks Brook Bridge railing at the Franklin Falls Dam located in Sanbornton, NH. The mission of this project is to enhance safety and compliance with state specifications by replacing the existing bridge railing and posts with a new railing system that meets New Hampshire Department of Transportation (NHDOT) standards. The goal is to ensure the structural integrity and safety of the bridge for public use. Work Details The contractor shall furnish all labor, materials, and equipment necessary for the complete removal of the existing bridge railing and posts at Weeks Brook Bridge. The work includes: 1. Installation of a new railing system anchored to the superstructure as detailed in contract drawings. 2. New railing posts and guardrails must conform to NHDOT standard details and specifications. 3. Connections to the existing bridge superstructure must follow project-specific designs provided in appendices. 4. The contractor is responsible for site preparation, including posting bridge closures and providing temporary barriers. 5. All work must comply with applicable Federal, State, and local codes, including safety regulations outlined by EM 385-1-1. 6. Specific materials include galvanized steel components per AASHTO standards, pressure-treated lumber for blocking, and installation of hazard markers as per NHDOT specifications. Period of Performance The period of performance for this contract is 150 days from the Notice to Proceed. Place of Performance The construction projects will be performed at Weeks Brook Bridge on Shaw Hill Rd, Sanbornton, NH.
Contacts
Contact nameJennifer Samela
Contact emailjennifer.m.samela@usace.army.mil
Contact phone(978) 318-8324
Same Region Opportunities