Cooling Tower Maintenance, Repair, and Training Services - Minneapolis VA Medical Center
Agency: VISN 23: Midwest Health Care Network
Location: Minnesota
NAICS: 238220
| Agency | Hennepin County [MN] |
|---|---|
| Deadline | 02/03/26 |
| Posted | 01/10/26 |
| Estimated Value | $5,000,000 - $10,000,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Minnesota |
CP 2182000; SAP 027-651-011; consists of 0.695 centerline miles of street reconstruction including storm sewer, sanitary sewer and water main replacement along CSAH 51. The project will convert the existing rural section to an urban section with curb and gutter and sidewalk. Four retaining walls will be constructed with the project. New street lighting will also be installed along CSAH 51. Along CSAH 19 only, 0.177 centerline miles of mill and overlay will be constructed.
Background The County of Hennepin, located in Minnesota, is issuing a solicitation for the reconstruction of CSAH 51 (Sunset Drive) as part of their ongoing efforts to improve local infrastructure. The project aims to enhance the roadway by converting the existing rural section into an urban section, which includes the installation of curb and gutter, sidewalks, and other necessary improvements. This initiative is part of a broader mission to ensure safe and efficient transportation within the county. Work Details The project involves approximately 0.695 centerline miles of street reconstruction along CSAH 51, including: - Replacement of storm sewer, sanitary sewer, and water main systems. - Construction of four retaining walls. - Installation of new street lighting along CSAH 51. Additionally, there will be a mill and overlay construction for 0.177 centerline miles along CSAH 19. The class of work includes grading, bituminous surfacing, storm sewer installation, sanitary sewer work, water main replacement, lighting installation, construction of rectangular rapid flashing beacons (RRFB), retaining walls, and ADA improvements. Period of Performance The contract work is scheduled to begin after the bid opening on February 3, 2026, with an expected completion date set for January 8, 2027. Place of Performance The work will be performed on CSAH 51 between CSAH 15 and CSAH 19 and on CSAH 19 between CSAH 51 and Coffee Bridge within the Cities of Orono and Spring Park. Bidder Requirements Bidders must comply with specific requirements including: - Submission of a First Tier Subcontractors List prior to bid opening. - Compliance with Minnesota Statutes regarding responsible contractor verification which includes having valid registrations for workers' compensation and unemployment insurance if applicable. - Bidders must also provide a Payment Bond and Performance Bond equal to the contract amount as security for construction completion.
| Contact email | eric.drager@hennepin.us |
|---|
Agency: VISN 23: Midwest Health Care Network
Location: Minnesota
NAICS: 238220
Agency: Minnesota Department of Transportation - Technical Consulting [MN]
Location: Minnesota
NAICS: Not Provided
Agency: Metropolitan Council [MN]
Location: Minnesota
NAICS: Not Provided
Agency: Minneapolis Public Housing Authority [MN]
Location: Minnesota
NAICS: Not Provided