SUCR Secondary Sewer Line Installation
Agency: NPS Intermountain Region
Location: Flagstaff, Coconino, Arizona
NAICS: 237110
| Agency | USFS Region 5: Pacific Southwest Region |
|---|---|
| Deadline | 01/09/26 |
| Posted | 01/06/26 |
| Estimated Value | $400,000 - $900,000 (AI estimate) |
| Set Aside | Small Business |
| NAICS | 237310 - Highway, Street, and Bridge Construction |
| PSC | Y1LB - Construction Of Highways, Roads, Streets, Bridges, And Railways |
| Location | Flagstaff, AZ 86001 United States |
This project will consist of reconditioning and resurfacing approximately 4.00 miles on FSR 535 and the removal and replacement of 6 culverts on FSR 535 and FSR 536. This project is located on the Flagstaff Ranger District of Coconino National Forest near Flagstaff, Arizona. FSR 535 is an aggregate surfaced road which runs east to west from its junction with AZ-89A. FSR 536 is also an aggregate surfaced road that runs east to west from its junction with FSR 535 to its junction with FSR 231 and FSR 538.
Background This project is issued by the USDA Forest Service and is located on the Flagstaff Ranger District of Coconino National Forest near Flagstaff, Arizona. The mission of this project is to enhance the road infrastructure for timber sale hauling and recreational activities such as camping and hunting. The goal of the contract is to recondition and resurface approximately 4.00 miles of FSR 535 and to remove and replace 6 culverts on FSR 535 and FSR 536. Work Details The scope of work includes: - Reconditioning and resurfacing approximately 4.00 miles on FSR 535. - Removal and replacement of 6 culverts on FSR 535 and FSR 536. - Optional work items A and B include reconditioning and resurfacing of approximately 1.41 additional miles on FSR 535. - Reconditioning tasks will involve redefining ditch lines, shoulders, the roadbed, roadway, and aggregate surface of the road. - The project will utilize a government material source located at Big Draw Pit for crushed aggregate surfacing, accessed from FSR 231B, approximately 9 miles from the junction of FSR 535 and AZ-89A. - Bedding Material and Structural Backfill for culvert installations shall be obtained from commercial sources. - Removed culverts must be disposed of in accordance with local, state, and federal regulations. Period of Performance The contract will be performed from January 20, 2026, to September 30, 2026. Place of Performance The construction projects will be performed in Flagstaff Ranger District of Coconino National Forest near Flagstaff, Arizona.
| Contact name | Blaine Greenwalt |
|---|---|
| Contact email | blaine.greenwalt@usda.gov |
| Contact phone | None |
Agency: NPS Intermountain Region
Location: Flagstaff, Coconino, Arizona
NAICS: 237110
Agency: USFS Region 5: Pacific Southwest Region
Location: Flagstaff, Coconino, Arizona
NAICS: 238190
Agency: Leasing Office
Location: Flagstaff, Coconino, Arizona
NAICS: Not Provided
Agency: Denver Service Center
Location: Flagstaff, Coconino, Arizona
NAICS: 236220