Paint and Lights Bldg 102 & Bldg 110

Project ID: W50S6T26QA027 FederalOpportunitiesSolicitation
Overview
AgencyDepartment of the Army
Deadline07/17/26
Posted06/16/26
Estimated Value$35,000 - $90,000 (AI estimate)
Set AsideSBA
NAICS238320 - Painting and Wall Covering Contractors
PSCN080 - Installation Of Equipment- Brushes, Paints, Sealers, And Adhesives
LocationFresno, CA 93727 United States
Description
Primary Latest Change

Summary

This requirement is for painting interior surfaces and upgrade lighting in office space and two vehicle workshops. Preparatory work will include repairing walls, sanding, and priming. Approximately 2,000 square feet of office space, and 5,500 square feet of production areas will be painted. The contractor will not be responsible for moving furniture nor equipment, but they must ensure it is protected. The contractor will also be responsible for replacing all interior incandescent light bulbs with LED bulbs Request for Quote (RFQ) details are provided on the attached solicitation. This requirement is being solicited as a small business set-aside. Review the RFQ solicitation instructions for quote submission criteria. Quotes shall be submitted electronically to the following email addresses: jarrod.sanchez@us.af.mil; justin.scales.1@us.af.mil A site visit is tentatively scheduled for Wednesday 24 June at 0900 PDT. The designated rally point will be the west gate visitor parking lot. Parking space is limited therefore carpooling is strongly advised. To be granted base access, Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification and submit a base access form. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided before the site visit. Refer to Attachment, Base Access Request, for additional instructions. Questions will be accepted until seven days prior to solicitation response deadline. The site visit is not mandatory but strongly recommended. Offerors are responsible for verifying conditions at the project site. As required by 15 U.S.C. 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below:

Selected Agency

DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all un-definitized equitable adjustments received during contract performance 2

Map (Newest Update)

Loading Map Loading Map

Summary: Background The contract is issued by the California Air National Guard, specifically the 144th Fighter Wing, with the goal of repainting and upgrading lighting in Buildings 102 and 110. This project aims to enhance the interior aesthetics and functionality of office spaces and vehicle workshops within these facilities. Work Details The contractor shall provide non-personal services including all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to accomplish the following tasks: painting approximately 2,000 square feet of office space and 5,500 square feet of production areas. Preparatory work will include repairing walls, sanding, and priming. Additionally, the contractor is responsible for replacing all interior incandescent light bulbs with LED bulbs. The contractor must ensure that furniture and equipment are protected during the work but will not be responsible for moving them. Period of Performance The geographic location(s) the construction projects will be performed (if provided) Place of Performance The construction projects will be performed at the California Air National Guard base in Fresno. Bidder Requirements This opportunity is a Small Business Set Aside - Total (SBA). Bidders must have relevant contractor or trade licenses. Bid/payment/performance bonds are required. Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification for base access and submit a base access form prior to a site visit.
Contacts
Contact nameJustin Scales
Contact emailjustin.scales.1@us.af.mil
Contact phone(559) 454-5129
Secondary contact nameJarrod Sanchez
Secondary contact emailjarrod.sanchez@us.af.mil
Secondary contact phone(559) 454-5129
Same Region Opportunities

ID Scanners

Agency: Department of Homeland Security

Location: California

NAICS: 518210