Primary
Latest Change
GOGA CONSTRUCT STINSON LG TOWER & CAFE
Map (Newest Update)
Loading Map Loading Map
Summary: Background The National Park Service (NPS), Contracting Operation West, is issuing this solicitation for the construction of a new facility at Golden Gate National Recreation Area, specifically at Stinson Beach. The goal of this contract is to replace the existing Lifeguard Tower and Cafe, which have exceeded their useful life, with a new code-compliant facility that will serve the same purpose for NPS ocean rescue operations and provide a separate cafe concession. Work Details The contractor will be responsible for multiple construction tasks including: - Demolition of the existing wood-framed Lifeguard Tower and Cafe, including hazardous materials abatement; - Construction of new concrete and wood foundations; - Building a new wood-framed structure; - Installation of plumbing, electrical, and mechanical systems; - Finishing work; - Creating new accessible boardwalks and paths. Additionally, the project includes constructing a dining patio and providing a warm-shell for future cafe use. The work must adhere to the attached specifications. Period of Performance The contract performance period is from August 3, 2026, to November 3, 2027. Place of Performance The construction projects will take place at Stinson Beach within the Golden Gate National Recreation Area. Incumbent Analysis (see Incumbents section for more detail) The solicitation for “GOGA CONSTRUCT STINSON LG TOWER & CAFE” appears to have a closely related prior contract for replacing the Stinson Beach Lifeguard Tower and Cafe at Golden Gate National Recreation Area. In particular, award 140P2021D0014-140P8524F0107 was awarded to Pc Anderson Hallas Architects for Title III architecture/engineering construction phase services (valued at $275,915) with a period of performance running from 09/12/24 to 07/31/27. Because the prior work is explicitly tied to the same facility replacement and includes construction-phase A/E support, it likely represents a continuation of the project’s design and construction oversight into the current build-out scope.