644 - Provu Capital Console Set
Agency: VISN 22: Desert Pacific Healthcare Network
Location: Arizona
NAICS: 334510
| Agency | USFS Region 5: Pacific Southwest Region |
|---|---|
| Deadline | 06/19/26 |
| Posted | 06/16/26 |
| Estimated Value | $150,000 - $450,000 (AI estimate) |
| Set Aside | SBA |
| NAICS | 238220 - Plumbing, Heating, and Air-Conditioning Contractors |
| PSC | J045 - Maint/Repair/Rebuild Of Equipment- Plumbing, Heating, And Waste Disposal Equipment |
| Location | Roosevelt, AZ 85545 United States |
Posted: May 13, 2026, 9:23 a.m. EDT
Background The Tonto National Forest, specifically the Tonto Basin Ranger District (TBRD), is seeking to address issues related to water leaks within its drinking water network. The primary goal of this contract is to eliminate known leaks, enhance the efficiency of the water network, and prepare for future leak repairs that may arise. The contractor will also be required to provide as-built drawings upon project completion. Work Details The contractor will be responsible for a variety of tasks including: 1. Mobilization, including bonding costs; 2. Relocation of hydrants at Teddy Bear and Christmas Loops; 3. Leak repair under pavement at Chipmunk and Grapevine Goose Loops; 4. Leak repair and water pipe replacement at Burnt Corral Campground; 5. Installation of a priority valve and reduction valve at Grapevine Group Campground; 6. Installation of a 4-inch reduction valve at Cholla Campground. Additionally, optional line items include further relocation of hydrants, leak repairs under and outside pavement, installation of valves, and replacement of existing water pipes with schedule #4 PVC. Period of Performance The contract period is from June 29, 2026, to June 28, 2027. Place of Performance The work will be performed in various locations within the Tonto National Forest, specifically the Tonto Basin Ranger District. Incumbent Analysis (see Incumbents section for more detail) The solicitation for TBRD Water Leak Repair Phase 2 (127EAX26Q0045) appears to have a closely related prior contract, 127EAU25P0007, awarded to Jstc for $26,650 (01/31/25–07/01/25). That earlier effort involved emergency plumbing repairs across several locations within the Tonto Basin Ranger District, which aligns with the current requirement to eliminate known water leaks and perform additional leak repairs and related water infrastructure work (e.g., hydrant relocation, under-pavement leak repairs, and valve installations). The “Phase 2” framing and the stated expectation of future leak repairs covered by modifications suggest continuity of the same drinking water system repair needs.
| Contact name | Troy McCullough |
|---|---|
| Contact email | troy.mcculough@usda.gov |
| Contact phone | None |
Agency: VISN 22: Desert Pacific Healthcare Network
Location: Arizona
NAICS: 334510
Agency: MICC Yuma Proving Ground
Location: Arizona
NAICS: 811310
Agency: Department of Energy
Location: Arizona
NAICS: 236210
Agency: BIA Western Region
Location: Arizona
NAICS: 333112