ENVIRONMENTAL ASSESSMENT FOR REPAIR OF OVERHEAD 70kV TRANSMISSION LINE South Loop 2 VSFB, CA

Project ID: FA461026_EA_SL2 FederalOpportunitiesPresolicitation
Overview
AgencySpace Force
Deadline06/30/26
Posted06/15/26
Estimated Value$150,000 - $450,000 (AI estimate)
Set AsideSBA
NAICS541620 - Environmental Consulting Services
PSCF999 - Other Environmental Services
LocationVandenberg Space Force Base Lompoc, CA 93437 United States
Description
Primary Latest Change

Based on the Statement of Work, the contractor will provide the services necessary to prepare a comprehensive Environmental Assessment (EA) for the repair of an overhead 70kV transmission line at Vandenberg Space Force Base. This includes project management, data collection, and extensive coordination with government and regulatory stakeholders. The core of the work involves conducting detailed technical analyses of the project's impact on cultural resources, natural resources (including wetlands and special status species), and construction noise. The contractor will produce a series of documents, including a Description of Proposed Action and Alternatives (DOPAA) and various technical reports. Ultimately, this effort will result in a legally sufficient EA document that will lead to a Finding of No Significant Impact (FONSI), a mitigated FONSI, or a determination that a full Environmental Impact Statement (EIS) is necessary. Interested vendors shall submit a capability statement and other relevant information NLT 30 June 2026 at 1400 PDT.

Summary (Newest Update)

Background The Department of the Air Force (DAF) is proposing to repair the overhead 70 kilovolt (kV) transmission line South Loop 2 at Vandenberg Space Force Base (VSFB) in Santa Barbara County, California. The goal of this contract is to prepare a comprehensive Environmental Assessment (EA) that meets legal and technical standards as outlined by the National Environmental Policy Act (NEPA) and related DOD procedures. Work Details The contractor will provide services necessary for the preparation of a comprehensive Environmental Assessment (EA) for the repair of an overhead 70kV transmission line. This includes project management, data collection, and extensive coordination with government and regulatory stakeholders. Key tasks include: conducting detailed technical analyses of the project's impact on cultural resources, natural resources (including wetlands and special status species), and construction noise; producing a Description of Proposed Action and Alternatives (DOPAA); generating various technical reports; and ultimately delivering a legally sufficient EA document that may result in a Finding of No Significant Impact (FONSI), a mitigated FONSI, or necessitate a full Environmental Impact Statement (EIS). The contractor must also recommend mitigation measures if significant impacts are identified. Period of Performance The geographic location(s) the contract will be performed (if provided) Place of Performance Vandenberg Space Force Base, Santa Barbara County, California. Bidder Requirements This opportunity is set aside for small businesses. Bidders must demonstrate relevant experience in environmental assessments, possess necessary licenses or certifications, and may require specific security clearances depending on the nature of the work.

Contacts
Contact nameChase French
Contact emailchase.french@spaceforce.mil
Contact phoneNone
Secondary contact nameRick Porter
Secondary contact emailrick.porter.1@spaceforce.mil
Secondary contact phoneNone