ARRAY PROBE
Agency: DLA Land and Maritime
Location: Virginia
NAICS: 334515
| Agency | NAVSUP Fleet Logistics Center Norfolk |
|---|---|
| Deadline | 06/22/26 |
| Posted | 06/15/26 |
| Estimated Value | Not Provided |
| Set Aside | SBA |
| NAICS | 238910 - Site Preparation Contractors |
| PSC | P500 - Salvage- Demolition Of Structures/Facilities (Other Than Buildings) |
| Location | Virginia Beach, VA 23459 United States |
The Contractor shall provide all labor, materials, heavy equipment, and supervision necessary to complete the demolition, debris removal, and comprehensive grading of the designated project area. See the Performance Work Statement within the full Solicitation Attachment for further details.
Background The INDIG Village Demolition project is initiated due to the existing structures within INDIG Village having surpassed their operational lifespan. The goal is to ensure safety and training standards are upheld by systematically replacing these structures in incremental phases. This approach allows for uninterrupted training delivery, which is essential for TEU2's mission objectives. Comprehensive site preparation, including the removal of existing infrastructure and grading, is required before the construction of new target buildings can commence. Work Details The Contractor shall provide all labor, materials, heavy equipment, and supervision necessary to complete the following tasks: 1. Conduct a joint site walk with government representatives to identify 23 buildings and 6 wall sections for demolition. 2. If using a crane, submit a crane package for approval. 3. Systematically demolish twenty-three training buildings made of wood down to ground level. 4. Demolish and remove six wall sections enclosing sub-compounds. 5. Extract all foundation elements, footings, and anchoring systems associated with demolished structures. 6. Load and transport all demolition debris off-site. 7. Ensure no debris remains on-site that could impede grading operations. 8. Execute comprehensive grading of the entire designated area after debris removal. 9. Level the site to resolve depressions and establish proper drainage gradients to prevent water pooling. 10. Prepare and compact the soil sub-base across the cleared area for future construction of new facilities. Period of Performance From Date of Award to - 60 Days After Award Place of Performance Fort Story, Virginia Beach, VA 23459 - INDIG Village Bidder Requirements Contractor personnel must maintain valid base access documentation at the time of quote submission.
| Contact name | Sherell Brown |
|---|---|
| Contact email | sherell.g.brown.civ@us.navy.mil |
| Contact phone | None |
| Secondary contact name | Morgan Olszak |
| Secondary contact email | morgan.e.olszak.civ@us.navy.mil |
| Secondary contact phone | None |
Agency: DLA Land and Maritime
Location: Virginia
NAICS: 334515
Agency: DLA Land and Maritime
Location: Virginia
NAICS: 326220
Agency: NSWC Dahlgren Division
Location: Virginia
NAICS: 334419
Agency: National Oceanic and Atmospheric Administration
Location: Virginia
NAICS: Not Provided