B-2 M-LIMIT (Main Landing Gear Integrated Maintenance & Integrity Tester)

Project ID: SSS9JUNE26 FederalOpportunitiesSources Sought
Overview
AgencyAFLCMC Tinker AFB
Deadline06/24/26
Posted06/09/26
Estimated Value$750,000 - $2,500,000 (AI estimate)
Set AsideNone
NAICS336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC4920 - Aircraft Maintenance And Repair Shop Specialized Equipment
LocationWarner Robins, GA 31098 United States
Description
Primary Latest Change

This is a Sources Sought Synopsis for market research and informational planning purposes only. AFLCMC/WBK-2 is seeking to identify sources capable of providing a new and modernized Main Landing Gear Tester (Part Number E72439-001), a Hydraulic Cabinet Assembly (Part Number 184000-715-100), and an associated tool kit for MLG door actuators. The complete deliverable requires on-site assembly, installation, and training at Robins Air Force Base, Georgia. This is not a solicitation, and no contract will be awarded from this notice; the government is seeking to identify qualified sources to determine the appropriate acquisition strategy.

Summary (Newest Update)

Background The United States Government (USG) is seeking to identify sources capable of providing a new and modernized Main Landing Gear Tester as part of a market research initiative by the Air Force Life Cycle Management Center (AFLCMC). This acquisition aims to replace outdated equipment and improve testing capabilities for MLG door actuators, addressing long wait times and establishing a sustainable multi-test capability for the weapon system's life. Work Details The complete deliverable includes: - A new modernized design and user manual for the Main Landing Gear Tester (Part Number E72439-001). - A new modernized design and user manual for the Hydraulic Cabinet Assembly (Part Number 184000-715-100). - A new tool kit for MLG door actuators, which must include: - Sizing rings - Swaging tools - Installation bullet - Holding and set fixtures - Retracted/extended length test gauges - Electrical test set (proximity box) - Torque wrench and adaptor set - Spring tester - Operations & Maintenance (O&M) and Calibration (CAL) Manual for the proximity box. The contractor is also required to provide on-site assembly, installation, and training at Robins Air Force Base, Georgia. Period of Performance The geographic location(s) the product will be delivered to or performed at Place of Performance Robins Air Force Base, Georgia Bidder Requirements Respondents must demonstrate engineering and data acquisition expertise, including in-house engineering workforce capabilities. They must provide evidence of experience in on-site training, assembly of the Main Landing Gear Tester, and follow-on support as needed. Generic capability statements or marketing materials are not acceptable.

Contacts
Contact nameGarrett Chase
Contact emailgarrett.chase@us.af.mil
Contact phone(405) 739-7185
Secondary contact nameMatthew Dunsmore
Secondary contact emailmatthew.dunsmore.1@us.af.mil
Secondary contact phoneNone
Same Region Opportunities