Silver Falls State Park North Gateway Visitor Center - Masonry

Project ID: S-63400-00017170 State|LocalOpportunities
Overview
AgencyOregon Parks and Recreation Department [OR]
Deadline06/25/26
Posted06/08/26
Estimated Value$250,000 - $900,000 (AI estimate)
Set AsideNot Provided
NAICSNot Provided
PSCNot Provided
LocationOregon
Description
Primary

Background

The North Gateway Visitor Center project is initiated by the agency responsible for managing Silver Falls State Park. The goal of this contract is to construct a masonry structure that will serve as a visitor center, enhancing the park's facilities and providing a welcoming space for visitors. The project aims to incorporate architectural precast concrete and stonework, ensuring durability and aesthetic appeal in line with the park's natural surroundings.

Work Details

The contractor is required to provide various masonry services, including: 1. **Architectural Precast Concrete**: Supply smooth-faced precast concrete units for copings and sills, adhering to specifications outlined in Section 03450. This includes submitting a complete product list within 30 days of contract award, providing concrete samples, and ensuring quality assurance through proper mix designs. 2. **Stonework**: Provide cut stonework for exterior applications, including fireplace hearths and natural thin veneer stone for both exterior and interior surfaces as specified in Section 04850. This involves submitting product data, shop drawings, and verification samples for approval. 3. **Rough Carpentry**: Complete wood framing to support structural requirements as detailed in Section 06100, ensuring compliance with applicable standards and moisture content regulations. 4. **Air and Weather Barriers**: Install air barriers and drainage planes on the building's exterior as per Section 07270, utilizing self-adhered membranes and commercial wraps to ensure weatherproofing. 5. **Flashing and Sheet Metal**: Provide flashing components as specified in Section 07600, including shop drawings for approval prior to installation. 6. **Joint Sealants**: Implement caulking systems for joints as described in Section 07920, using specified sealants that match adjacent surfaces.

Period of Performance

The contract will be performed over a period defined by the construction schedule established post-award, typically spanning several months depending on weather conditions and site readiness.

Place of Performance

The work will be performed at Silver Falls State Park located in Oregon, specifically at the site designated for the North Gateway Visitor Center.

Bidder Requirements

Bidders must demonstrate experience with similar projects and comply with all local regulations regarding construction practices. They are required to submit relevant certifications and documentation proving their qualifications.