Snow Hill at Short Tail Springs Road Improvements
| Agency | Hamilton County [TN] |
|---|---|
| Deadline | 07/14/26 |
| Posted | 06/05/26 |
| Estimated Value | $650,000 - $1,800,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Tennessee |
Requested Work
The project involves comprehensive improvements at Snow Hill and Short Tail Springs Road (Project #ENG-26-303), specifically located at 7300 Snow Hill Road, Ooltewah, TN 37363. The scope of work includes: - Expansion of the existing road - Construction of curb and gutter systems - Installation of storm drainage infrastructure - Provision of all labor, equipment, materials, tools, supervision, and any additional items required to complete the project as detailed in the design drawings and contract specifications
Requesting Entity
This solicitation is issued by Hamilton County, Tennessee, on behalf of the Hamilton County Highway Department.
Contract Background
This construction contract is part of ongoing infrastructure improvements managed by the Hamilton County Highway Department. The project is identified as Snow Hill at Short Tail Springs Road Improvements (Project #ENG-26-303).
Contract Requirements
All work must be performed in accordance with the provided design drawings, Contract Documents, and Specifications. Contractors are responsible for furnishing all necessary resources to satisfactorily complete the project.
Instructions on Submission
Sealed bids are required for this solicitation. For detailed instructions on obtaining specifications and bidding documents, refer to the document titled "ADVERTISEMENT AND CONTACT INFORMATION."
Opportunity ID
0626-076
No same-region records available.