CT Route 85 Computerized Traffic Control Signal System Replacement in Waterford

Project ID: 0152-0164 State|LocalOpportunities
Overview
AgencyConnecticut Department of Transportation [CT]
Deadline07/01/26
Posted06/03/26
Estimated Value$450,000 - $1,800,000 (AI estimate)
Set AsideNot Provided
NAICSNot Provided
PSCNot Provided
LocationConnecticut
Description
Primary

Background

The Connecticut Department of Transportation is issuing this Invitation to Bid (ITB) for the replacement of the computerized traffic control signal system on CT Route 85 in Waterford. The goal of this contract is to enhance traffic management and improve safety on this critical roadway.

Work Details

The contractor will be responsible for the complete replacement of the computerized traffic control signal system along CT Route 85 in Waterford. This includes all necessary equipment, installation, and integration with existing traffic management systems. Specific details regarding the types of signals, control systems, and any additional infrastructure improvements will be outlined in the provided contract plans and special provisions.

Period of Performance

The contract work is scheduled to commence on June 03, 2026, and conclude by July 01, 2026.

Place of Performance

The work will be performed on CT Route 85 in Waterford, Connecticut.

Bidder Requirements

All vendors are eligible to respond to this bid. Specific requirements regarding bonding, insurance, or subcontracting are not detailed in the provided solicitation text.

Same Region Opportunities