Thermal CAT Camera System, Pole Mounted
Agency: Department of the Army
Location: New Hampshire
NAICS: 334290
| Agency | USACE New England District |
|---|---|
| Deadline | 06/01/26 |
| Posted | 05/20/26 |
| Estimated Value | $40,000 - $150,000 (AI estimate) |
| Set Aside | SBA |
| NAICS | 562119 - Other Waste Collection |
| PSC | S216 - Housekeeping- Facilities Operations Support |
| Location | Franklin, NH United States |
The U.S. Army Corps of Engineers - New England District is issuing a Solicitation Notice for Debris Removal Log Boom and Catchment Area, Franklin Falls Dam, Franklin, NH.
Contractor shall furnish all transportation, equipment, labor and job planning needed to remove debris from the log boom and catchment area at Franklin Falls Dam. All debris shall be removed from and properly disposed of off US Government property according to Federal, State, and local regulations. Chipping of debris in place shall not be permitted unless all chips are transported off site for proper disposal. The project area is located along the Pemigewasset River in Franklin, NH. All work shall be completed in accordance with the Performance Work Statement. This procurement is set-aside for small business vendors. The applicable NAICS code is 562119 with a Small Business Size Standard of $47 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
Background The U.S. Army Corps of Engineers - New England District is issuing this solicitation for debris removal services at the Franklin Falls Dam located in Franklin, NH. The mission of the Corps is to provide vital public engineering services in peace and war to strengthen the nation's security, energize the economy, and reduce risks from disasters. The goal of this contract is to ensure the effective removal of debris from the log boom and catchment area, thereby maintaining safety and environmental standards. Work Details The contractor shall furnish all transportation, equipment, labor, and job planning needed to remove debris from the log boom and catchment area at Franklin Falls Dam. All debris must be removed from and properly disposed of off U.S. Government property according to Federal, State, and local regulations. Chipping of debris in place is not permitted unless all chips are transported off-site for proper disposal. Specific tasks include: 1) Providing all labor, materials, equipment, and transportation necessary for debris removal at both the log boom and catchment area; 2) Ensuring compliance with safety requirements as outlined in EM 385-1-1; 3) Preparing a site-specific Accident Prevention Plan; 4) Conducting inspections of completed work to ensure compliance with the Performance Work Statement; 5) Submitting required documentation prior to commencement of work including various forms related to safety and equipment compliance. Period of Performance The period of performance for this contract shall be 120 days from contract award, weather permitting. Place of Performance Franklin Falls Dam, located at 46 Granite Dr., Franklin, NH 03235.
| Contact name | Alicia LaCrosse |
|---|---|
| Contact email | alicia.n.lacrosse@usace.army.mil |
| Contact phone | (978) 318-8902 |
Agency: Department of the Army
Location: New Hampshire
NAICS: 334290
Agency: New Hampshire National Guard
Location: New Hampshire
NAICS: 334516
Agency: USACE New England District
Location: New Hampshire
NAICS: 237310
Agency: Naval Supply Systems Command
Location: New Hampshire
NAICS: 332919