SD FTFW Madi 10(2) & 9000(1) Rehab Madison WMD HQ Road

Project ID: 6982AF26B000008 FederalOpportunitiesSolicitation
Overview
AgencyCentral Federal Lands Highway Division
Deadline06/14/26
Posted05/15/26
Estimated Value$250,000 - $650,000 (AI estimate)
Set AsideNone
NAICS237310 - Highway, Street, and Bridge Construction
PSCY1LB - Construction Of Highways, Roads, Streets, Bridges, And Railways
LocationMadison, SD 57042 United States
Description
Primary Latest Change

PROJECT NUMBER

SD FTFW MADI 10(2) & 9000(1)

PROJECT NAME

REHAB MADISON WMD HQ ROAD

PROJECT DESCRIPTION

The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches of asphalt concrete pavement (ACP) over 4 inches of aggregate base material. The proposed parking lot will be installed at grade with the adjacent sidewalk and concrete trail. The project will improve safety and mobility for staff and visitors by providing improved access to and parking for the Payne Waterfowl Production Area (WPA). The pavement improvements will also extend the service life of the access road and parking lot wearing surfaces.

SCOPE OF THE WORK

The existing two-way, single-lane operation of the access road will be preserved by constructing a consistent 14-foot roadway section. Pavement reconstruction will also address the approach road apron on the left side of the roadway between stations 106+02 and 106+74. The project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center's east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break.

Summary (Newest Update)

Background The project is issued by the United States Fish and Wildlife Service (USFWS) and focuses on the rehabilitation of the Madison Wetland Management District (WMD) Headquarters road. The goal of this contract is to enhance safety and mobility for staff and visitors by improving access to the Payne Waterfowl Production Area (WPA) through pavement reconstruction. Work Details The scope includes pavement reconstruction of the approach road and parking lot, featuring a designed pavement section of 3.5 inches of asphalt concrete pavement over 4 inches of aggregate base material. Key tasks include: - Preserving a two-way, single-lane operation with a consistent 14-foot roadway section. - Full reconstruction of the existing parking lot. - Installation of eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. - Maintaining existing tie-in elevation with a 6-foot sidewalk. - Regrading the parking surface to a uniform 1.75% cross slope. - Addressing the approach road apron between stations 106+02 and 106+74. Place of Performance The construction projects will be performed at the Madison Wetland Management District Headquarters and Visitor Center.

Contacts
Contact nameDouglas Whitcomb
Contact emailcflacquisitions@dot.gov
Contact phoneNone
Secondary contact nameJorey Deml
Secondary contact emailcflcontracts@dot.gov
Secondary contact phoneNone
Same Region Opportunities