Overview
AgencyUSACE Sacramento District
Deadline06/04/26
Posted05/14/26
Estimated Value$1,500,000 - $5,000,000 (AI estimate)
Set AsideSBA
NAICS237990 - Other Heavy and Civil Engineering Construction
PSCF019 - Natural Resources/Conservation- Other Wildlife Management
LocationCA 95977 United States
Description
Primary Latest Change

The purpose of the Yuba Gravel Placement project is to place suitable-sized spawning gravel within the upper Narrows reach for rehabilitating associated geomorphic processes and aquatic habitat in the Englebright Dam reach of the Lower Yuba River. Implementation of a long-term augmentation program will serve to improve the overall ecological functionality of the channel. The project will provide gravel and cobble suitable for anadromous salmonid adult spawning, embryo incubation, and survival to emergence in a key area in the lower Yuba River designated as critical habitat for the Central Valley spring-run Chinook salmon and the Central Valley steelhead.

Summary (Newest Update)

Background The Yuba Gravel Placement project is initiated by the U.S. Army Corps of Engineers as part of a Biological Opinion issued by the National Marine Fisheries Service under Section 7 of the Endangered Species Act. The primary goal of this contract is to rehabilitate geomorphic processes and aquatic habitat in the Englebright Dam reach of the Lower Yuba River, specifically to enhance ecological functionality for critical habitats designated for Central Valley spring-run Chinook salmon and Central Valley steelhead. Work Details The contract involves several key tasks: 1. Gravel Purchase and Delivery: A total of 5,000 short tons of suitable-sized spawning gravel must be procured and delivered. 2. Placement of Gravel: The gravel placement must occur within a designated window from July 15th to September 1st, with work commencing within the first five days unless directed otherwise by the Contracting Officer's Representative (COR). This task also requires placement of an additional 5,000 short tons of gravel. 3. Water Truck Standby: Provision for standby water trucks as needed during operations. 4. Accident Prevention Plan: Development and implementation of a comprehensive plan to ensure safety during project execution. Place of Performance The geographic location for this project is along the lower Yuba River downstream of Englebright Dam, specifically in Yuba County, California.

Contacts
Contact nameJulie Maxwell
Contact emailjulie.maxwell@usace.army.mil
Contact phone(916) 557-7989
Secondary contact nameDaniel E. Czech
Secondary contact emaildaniel.e.czech@usace.army.mil
Secondary contact phone(916) 557-7012