San Luis Obispo (SBP) ATCT Roof Replacement

Project ID: 00SBP FederalOpportunitiesSolicitation
Overview
AgencySouthwestern Region
Deadline06/02/26
Posted05/14/26
Estimated Value$35,000 - $65,000 (AI estimate)
Set AsideSBA
NAICS238160 - Roofing Contractors
PSCY1BA - Construction Of Air Traffic Control Towers
LocationSan Luis Obispo, CA 93401 United States
Description
Primary Latest Change

The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: Remove and dispose of existing roofing system from the SBP ATCT cab roof. Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. Remove and replace all roof drains. Remove and replace roof hatch Remove and relocate grounding counterpoise from roof to parapet wall. Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.

Summary (Newest Update)

Background The Federal Aviation Administration (FAA) is issuing a contract for the refurbishment of the roof at the San Luis Obispo (SBP) Air Traffic Control Tower (ATCT). The goal of this contract is to ensure the integrity and safety of the ATCT by replacing its roofing system, which is critical for operational efficiency and compliance with safety regulations. Work Details The subcontractor shall furnish all labor, materials, equipment, supervision, and services required to replace the roof at the ATCT at SBP. The scope of work includes: 1. Remove and dispose of existing roofing system from the SBP ATCT cab roof. 2. Provide and install a roof hatch guardrail kit with a self-closing gate, galvanized finish to meet code compliance. 3. Remove and replace all roof drains. 4. Remove and replace roof hatch. 5. Remove and relocate grounding counterpoise from roof to parapet wall. 6. Remove debris and trash generated from work and dispose of it per local and state requirements daily. Period of Performance The contractor must begin performance within 30 calendar days after receiving the award notice to proceed and complete it within 90 calendar days. Place of Performance San Luis Obispo Municipal Airport, 925 Airport Drive, San Luis Obispo, California 93401.

Contacts
Contact nameRodgers Cox
Contact emailrodgers.l.cox@faa.gov