Background
The contract is issued by the Sussex County Board of County Commissioners for the Replacement of Sussex County Bridge X-03, located at Ross's Corner Sussex Road (CR 565) over Papakating Creek Tributary in Wantage Township, Sussex County, New Jersey. The project aims to replace an existing bridge structure to enhance safety and improve traffic flow in the area.
Work Details
The work to be performed under this contract includes: - Demolition and removal of the existing 70 LF 103” X 71” 8 Gauge Corrugated Metal Plate Arch. - Construction of a new 71 LF CORRUGATED METAL, 71” X 103” PIPE ARCH (Polymer Coated). - Construction of reinforced cast-in-place concrete wall supported on spread footing. - Construction of reinforced cast-in-place concrete moment slab on spread footing. - Installation of select backfill material. - Full depth bituminous pavement replacement between stations 12+40 and 13+20. - Mill and pave between stations 12+00 and 12+40 and stations 13+20 and 13+50. - Installation of MASH compliant guide rail and end treatments/crash cushion compressive barrier. Additionally, the project must adhere to NJDEP permit conditions regarding environmental protection, including restrictions on construction activities during certain periods to protect local wildlife habitats.
Period of Performance
The contract is expected to commence upon award and is anticipated to be completed by April 2026.
Place of Performance
The geographic location for the performance of this contract is Sussex County, New Jersey, specifically at Ross's Corner Sussex Road (CR 565) over Papakating Creek Tributary in Wantage Township.
Bidder Requirements
Bidders must not be included in any report of suspensions or debarments maintained by the State of New Jersey Department of Labor and Workforce Development or the Department of the Treasury. Bidders are required to submit a list of all subcontractors and fabricators involved in the project. Compliance with specific insurance requirements and bonding may also be necessary.