Replacement of Tillotson Road Bridge Over Thompson Brook
Overview
| Agency | Town of Avon [CT] |
|---|---|
| Deadline | 06/09/26 |
| Posted | 05/11/26 |
| Estimated Value | $1,800,000 - $3,200,000 (AI estimate) |
| Set Aside | Not Provided |
| NAICS | Not Provided |
| PSC | Not Provided |
| Location | Connecticut |
Description
The Town of Avon (the "Town") is soliciting bids to remove and replace the existing roadway bridge (no. 004015) located at Tillotson Road over Thompson Brook in accordance with the project drawings and specifications included in this Invitation for Bid.
Same Region Opportunities
No same-region records available.