WATER POLLUTION CONTROL PLANT IMPROVEMENTS

Project ID: 66551 CAIRO, PE-66551-NONST-2027-000000016 State|LocalOpportunities
Overview
AgencyCity of Cairo [GA]
Deadline06/09/26
Posted05/11/26
Estimated Value$4,500,000 - $12,000,000 (AI estimate)
Set AsideNot Provided
NAICSNot Provided
PSCNot Provided
LocationGeorgia
Description
Primary

Background

The City of Cairo is issuing a solicitation for the construction of improvements to the Water Pollution Control Plant. This project aims to enhance the facility's capabilities and ensure compliance with environmental standards. The contract will be funded by a grant from the Georgia Environmental Finance Authority (GEFA) and the American Rescue Plan Act (ARPA).

Work Details

The work includes furnishing all labor, materials, and equipment necessary for the construction of the Water Pollution Control Plant Improvements as detailed in the construction drawings. Key components of the work include: - Demolition - Site work - Concrete channels and structures for a grit removal system - Concrete slabs and driveway - Bar screen - Screening conveyor - Stop gates - Grit removal system - Screw conveyor and grit concentrator. Additionally, hydraulic dredging of four tanks (including an orbal oxidation ditch, two clarifiers, and a digester), installation of an aluminum walkway, rehabilitation of the south clarifier and orbal oxidation ditch are included. The scope also encompasses all necessary piping, drains, valves, appurtenances, and electrical work to ensure a complete and functional facility.

Period of Performance

The time allotted for substantial completion is 300 consecutive calendar days from the start date. The total time for contract close-out is 330 consecutive calendar days.

Place of Performance

The contract will be performed at the Water Pollution Control Plant located in Cairo, Georgia.

Bidder Requirements

Bidders must be licensed Utility Contractors by the State of Georgia. License numbers must be clearly indicated on the bid envelope. Bids must include a Bid Bond or certified cashier’s check amounting to at least 10% of the bid amount. Successful bidders will also need to provide Performance and Payment Bonds at 100% of the contract amount. All contractors and subcontractors must register with E-Verify to comply with Georgia's Security and Immigration Compliance Act.